User's Manual Part 3

Installing the 100G Datalogging Commercial Gas Endpoint on an
Itron/Actaris Commercial Meter
100G Datalogging Installation Guide - Direct Mount 71
5. Place the index cover over the index with the clear side covering the index dials for
easy reading. Align the holes in the index cover with the endpoint adapter plate
mounting holes. Secure with the four mounting screws from the adapter kit. Tighten
the mounting screws in a diagonal alternating pattern.
Insert the first screw and tighten enough to hold the index in place.
Insert the second screw and tighten two to three turns.
Insert the third mounting screw and tighten two to three turns.
Insert the fourth mounting screw and tighten.
Tighten the first, third and second screw. Turn each screw 1/4 to 1/2 turn after the
screw contacts the index cover. Each index mounting screw must be tightened evenly.
If you have access to a torque-driver, tighten mounting screws to 72-inch pounds.
6. Insert tamper seals in the tamper seal cups on the index cover and press into place
with an 11/32 nut driver or similar blunt tool.