Installation Guide
Table Of Contents
- Cellular 500G Module Remote Mount Installation Guide
- Contents
- New in This Document
- 1 Introduction
- 2 Mounting
- 3 Programming
- 4 Specific Meter Manufacturer Installation
- 5 Using Gel-cap Connectors to Complete Wiring Connections
- 6 Optional Sealant Application Instructions
- A Important Safety and Compliance Information
- U.S. and Canadian Patent Numbers
- USA, FCC Part 15 Spectrum Compliance
- Modifications, Repairs, Installation, and Removal
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Transportation Classification
- Lithium Battery Safety
- Equipment Repairs
- Intrinsic Safety
- Electrostatic Ignition Hazard
- Module Cleaning
- Do Not Drop
24. Verify that the encoder cable is in the correct position in the cable slot of the gasket. Fully
tighten the screws in an alternating pattern. Install utility-approved security seals and wires
as required.
Programming and Requirements Notes
For Cellular 500G programming, see Programming on page 18.
Residential Module Programming Notes
The module is programmed based on the meter’s drive rate. Take note of the index drive rate
shown on a lower dial on the index. Elster American meter index drive rates are either 1 cubic
foot, 2 cubic feet or 0.05 cubic meters (not shown below).
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation
October 11, 2021 815-0622-00 REV 000 Itron, Inc. Page 32 of 99
DRAFT