Installation Guide

Table Of Contents
1. Programming the instrument and verifying that the Honeywell instrument is set up to work
with the Cellular 500G. Programming requires Honeywell software. Reference Honeywell
product and software documentation for the correct software and version requirements.
2. Installing the instrument and any required retrofit components.
3. Mounting the Cellular 500G to a pipe or flat vertical surface. For more information, see
Mounting on page 12.
Pipe mount using the Itron pipe mount kit CFG-0005-003.
Custom Honeywell mounting using Honeywell Kit 22-1077.
Custom mounting requires three #8-32 by 1/2 inch screws, three #8 metal flat
washers, and three rubber sealing washers.
4. Connecting the Cellular 500G to the instrument.
5. Programming the Cellular 500G. For programming information, see Programming on page
18.
Mounting Instructions
Two Remote Modules Mounted On a Honeywell Mini-Max Instrument
1. Place the Honeywell Instrument volume corrector in shutdown condition and disconnect
all power from the Mini-Max main board.
2. Remove the battery pack from the volume corrector and set it aside.
3. Remove the four screws from the main board and the board from the enclosure. Set the
board aside.
4. Remove the two hex screws from the input switchboard and the switchboard from the
enclosure and set it aside. You will re-install the switchboard later.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation
October 11, 2021 815-0622-00 REV 000 Itron, Inc. Page 66 of 99
DRAFT