User's Manual
Table Of Contents
- Contents
 - Before You Begin
 - CCU/Repeater Basics
 - Planning a CCU/Repeater Installation
 - Installing the CCU/Repeater
 - Battery Care and Replacement
 - Detailed CCU/Repeater Specifications
 - Status and Diagnostics
 - Index
 
Chapter 3  Installing the CCU/Repeater 
34   CCU 100 and Repeater 100 Installation Guide 
  Proprietary and Confidential 
Tower Installation Overview 
The Tower CCU 100 (TCU) installation differs significantly from other CCU 100 
installation profiles in that the CCU 100 is installed within a cabinet enclosure at the base of 
a radio tower and all of the antennas are mounted remotely. The standard cabinet protects 
the hardware from adverse environmental conditions and provides easy access for servicing 
the CCU and its related components. 
The TCU box comes preassembled except for the CCU. The CCU must have the ICS 
procedure performed prior to installing the CCU in the TCU box. 










