User Manual
CAM Installation for RF/PLC Applications
OpenWay® Riva™ CAM / ACT Coupler Unit  18
. 
Illustration Callout Number  Description 
1 
PLC cable 
2 
Antenna cable connection 
3 
Plastic cable tie 
9.  Ensure the cables are routed so that they do not interfere with door closure. Use a single plastic cable tie to 
secure the PLC cable and the antenna cable to the tie loop on the front of the CAM. 
10. Close the door and secure by tightening the six captive bolts using the sequence shown below. Use a 
torque of 6-7 foot-pounds when tightening the bolts. 










