How To Guide

Commercial Installation Guideline Page 4 of 4
ITEC II05042011
i
Any failure of the underlayment or flooring due to the underlayment is NOT the responsibility of IVC US.
IVC US does not recommend installing resilient flooring over wood flooring or wood subfloors applied
directly over concrete or sleeper–construction subfloors.
ii
All conditions associated with gypsum concrete, including but not limited to cracking, crumbling,
powdering and moisture, that result in bond failure are NOT warranted by IVC US.
iii
IVC US will not warrant or accept responsibility of any kind for flooring failures related to the use of
unacceptable substrates & surfaces.
iv
The installer is responsible for labor costs to repair or replace material with defects that were apparent
before the start of the installation.