Installation Guide

11
Leading the Way
IVC US Residential Installation Guide – Sheet Vinyl Flooring
IVC US will not warrant or accept responsibility of any kind for ooring failures related to the
use of unacceptable substrates and surfaces.
Floor Preparation:
Floor must be clean, smooth, at and dry. Remove all foreign substances such as wax,
grease, dirt, construction markings and contaminants, and any substance or chemical that
would interfere with a good bond. Fill all holes and cracks with a latex fortied Portland ce-
ment based patching compound. IVC US only recommends the use of latex fortied Port-
land cement based products as a satisfactory patching or leveling compound.
IVC US recommends priming extremely porous oors with IVC FLEX -PRIM Acrylic Latex
Primer to prevent over absorption of adhesives, dust containment, and to insure a better
bond of the adhesive to the suboor/underlayment.
Moisture Testing: It is the responsibility of the ooring contractor and the installer to con-
rm all concrete substrates, both old and new, for moisture transmission using the Calcium
Chloride Moisture Test according to ASTM F-1869. Moisture vapor transmission should not
exceed the recommended levels of 8 lbs. or less per 1,000 sq. ft. in 24 hours. This test should
be performed and documented prior to installation. A second testing option determines-
relative humidity in concrete oor slabs using In-Situ Probes, which should be less than 90%
RH per ASTM F-2170 before, during and after installation. These acceptable moisture read-
ings are only applicable when using iGrip adhesive.
PH LEVELS: PH must be between 5 and 9
Inspection of ooring material prior to installation is required. Any defects should be
immediately reported to the retail store from which the ooring was purchased before
installation. IVC US will not be responsible for labor costs to repair or replace material with
defects that were apparent before or noticed at the end of an installation. The job site and
all ooring material and adhesive must be kept for 24 hours before, during and after instal-
lation between 65˚ F and 85˚ F (18°C and 29°C).
PLEASE NOTE: If removal of existing resilient oor covering is required, follow all recom-
mended Resilient Floor Covering Institute (RFCI) work practices at www.rfci.com.
Application
Width x Depth x Spacing
Trowel Specications
Spread Rate Type of Installation
1/16” x 1/32” 1/32” U Trowel
1.6 mm x 0.8 mm x 0.8 mm U
Up to 350 sq. ft./ gal
Up to 8.6 sq. meters / liter
Porous and
Non-Porous Substrate
This document is reviewed on an ongoing basis. Control # MKF_0012_0 8/13/13