LEANER SETUP MANUAL PAT E N T E D S I N G L E A U G E R G R A I N (Rev. 06/09/12) C A R T S J. & M. Mfg. Co., Inc. P.O. Box 547 Ft. Recovery, OH 45846 Ph: (419) 375-2376 Fax: (419) 375-2708 www.jm-inc.
LEANER SETUP MANUAL Detail # Description Quantity 1 2 3 3/8”-16 x 1” serrated flange hex bolt 3/8”-16 x 1” serrated flange hex nut 3/8”-16 x 1” centerlock hex nut 118 108 10 NOTE: This is a general list of parts for a leaner. Some of these will be already installed on arrival or installed in sideboard set up. The purpose of this list here is to provide a visual aid along with the previous page. STEP - 1.
LEANER SETUP MANUAL STEP - 1.0 Remove the bolt that holds the two off auger sideboards together for transport. STEP--2.0 1.0 STEP Install the front corner using 3/8” X 1” bolts and nuts.
LEANER SETUP MANUAL STEP - 3.0 Install the back piece to the rear corner using 3/8” X 1” bolts and nuts. STEP--3.1 1.0 STEP Install the side piece to the rear corner using 3/8” X 1” bolts and nuts.
LEANER SETUP MANUAL STEP - 4.0 Fold out the front sideboard. STEP--5.0 1.0 STEP Insert 3/8” X 1” bolt and nut in adjustment brace and shell bracing. Adjust brace until the carts sidewall is straight.
LEANER SETUP MANUAL STEP - 5.1 6.0 Install the Front Off Auger Side Brace and bolt with 3/8” X 1”. STEP - 6.0 Fold out the rear sideboard. Insert bolts and nuts in adjustment braces. Then adjust the braces until the carts sidewall is straight and in line. Complete inserting all bolts to the sideboards and corners and tighten.
LEANER SETUP MANUAL STEP - 7.0 Also note that there are now two styles of triangular bolt on bracing. Above is a new brace that has been added.
LEANER MODEL GRAIN CART TARP INSTALLATION INTRO Grain Cart Tarp Installation: Generally speaking, tarp installations are similar for all models of J&M Grain Carts. The 1500 Grain Cart does have some differences however compared to the other J&M Grain Carts. In the rest of this manual, the general Grain Cart Tarp Installaion Manual was used and modified to display the correct installation of the Tarp for the 1500 Grain Cart.
LEANER MODEL GRAIN CART TARP INSTALLATION 7-1 27 -8-
LEANER MODEL GRAIN CART TARP INSTALLATION Detail # 1 2 3 4 5 6 7 7-1 7-2 8 Description Tarp crank handle 1” schedule 10 x 198” long pipe 1” x 1” 14ga x 192” long square tubing Drip edge Spring Return Rear End Cap (Bolt Together, No Wind Lip) Front End cap (Bolt Together, Wind Lip) Rear Short End Cap (BT, NWL, 4’ Long) Front Short End Cap (BT, WL, 4’ Long) *Bows 1326’s 1000’s,1050’s, 1150’s 620’s, 750’s, 875’s 525’s 9 3/16” Diameter Ridge Cable 10 3/8”-16 Centerlock Hex Nut 11 3/8”-16 x 2” Hex Bolt 12
LEANER MODEL GRAIN CART TARP INSTALLATION STEP - T1.0 Use the Hanger Bracket to mark and drill four 3/8” holes on the rear of the cart as shown above. The 29 3/4” dimension is from the top of the shell, not the top of the sideboard. Attach the hanger bracket to the back wall with four 3/8”-16 x 1” serrated flange hex bolts and four 3/8”-16 serrated flange hex nuts. STEP - T2.
LEANER MODEL GRAIN CART TARP INSTALLATION STEP - T3.0 Use a pair of vise grips or extra set of hands to temporarily hold the 2 pieces of drip edge (Detail #4) to the newly flipped out sideboards with the bolt holes lined up. Bolts in a later step will secure the drip edge. (The drip edge should be centered from the front to the rear of the cart.) Make sure that the drip edge is flush to the inside of the sideboard. STEP- T4.0 - 1.
LEANER MODEL GRAIN CART TARP INSTALLATION STEP - T5.0 Splice There should be a splice plate already installed on the end cap that is on the 1500 Grain Cart. Place the 4’ Bolt On End Cap (Detail #7-1 and Detail #7-2) over top of this splice, lining up the hole patterns and bolt together using 3/8”-16 x 5/8” serrated flange hex bolts. Insert bolts into the remaining holes. This will need to be done for the front and back 4’ Bolt On End Cap.
STANDARD GRAIN CART TARP INSTALLATION STEP - T6.0 Install the Spring Return on the front of the grain cart using ten 1/4”-16 x 3/4” long self tapping bolts on the front of the grain cart. It should be placed as far to the opposite auger side as possible and as high as possible. The pulley wheels should be pointing to the opposite auger side of the grain cart. Try to get the spring return as high up on the wall of the grain cart as possible, while keeping it level.
STANDARD GRAIN CART TARP INSTALLATION STEP - T8.0 Slide all *bows under the pre-tensioned ridge cables. Then install two 1/4”-20 x 3/4” serrated flange hex bolts and two 1/4”-20 serrated flange hex nuts on each end of all *bows. Line the bows up with the holes in the sideboards and not the drip edge if the holes are different. If drip edge holes are different, they will need to be drilled. STEP- T9.0 - 1.0 STEP View of all *bows installed under three ridge cables.
STANDARD GRAIN CART TARP INSTALLATION STEP - T10.0 Stiffening Patch Insert the 1”x1” 14ga x 192” long square tube into the sleeve on the Canvas Tarp that is on the opposite side of the Stiffening Patch. Center the canvas tarp on the 1” x 1” 14ga x 192” long square tubing. There should be aproximately 2” (5cm) of tubing sticking out each end of the tarp. Use a 1/4” drill bit to drill through the canvas tarp and one wall of the 1” x 1” 14ga x 192” long square tubing. (See STEP-8.
STANDARD GRAIN CART TARP INSTALLATION STEP - T12.0 2 1/2” (6.4 cm) 14 ”( Stop Brackets 35 .5c m) Center the 1” square tube that is riveted to the canvas tarp on the auger side of the cart. Use a 3/8” drill bit to drill three holes through the square tubing and auger side wall of the cart. The holes should be approximately 2 1/2” down from the top of the sideboard. Two holes should be placed 14” from the ends of the square tubing and the third hole should be centered on the square tubing.
STANDARD GRAIN CART TARP INSTALLATION STEP - T14.0 Crank Handle 3/8”x2” Universal Joint 1/4”x2 1/2 Install the universal joint using two 3/8”-16 x 2” hex bolts and two 3/8”-16 centerlock hex nuts. Install the tarp crank handle using one 1/4”-20 x 2 1/2” hex bolt and one 1/4”-20 centerlock hex nut. (Note: Universal joint may be pre-assembled.) STEP - T15.0 Tarp Standoff Install each tarp standoff at each end of the grain cart wall on the off auger side with two 1/4” x 1 1/2 self tapping bolts.