Setup

Slide all *bows under the pre-tensioned ridge cables. Then install two 1/4”-20 x 3/4” serrated
ange hex bolts and two 1/4”-20 serrated ange hex nuts on each end of all *bows. Line the bows
up with the holes in the sideboards and not the drip edge if the holes are different. If drip edge
holes are different, they will need to be drilled.
STEP - T8.0
STEP - 1.0
STEP - T9.0
View of all *bows installed under three ridge cables.
*See parts list for number of bows needed per cart size.
-14-
STANDARD GRAIN CART TARP INSTALLATION