Installation Manual Owner's manual

FAA Approved Installation Manual for the EDM-960 Report No 909
Primary Engine Data Management System Page 1 of 46 Rev D
Date 2-6-2014
TABLE OF CONTENTS
1.
Revisions_____________________________________________________________________________2
2. Read This First ________________________________________________________________________2
3. Instrument Marking_____________________________________________________________________3
4. Primary TSO Label _____________________________________________________________________3
5. Operation and Abbreviations_____________________________________________________________4
6. Dimming______________________________________________________________________________5
7. Locating and Installing the Indicator and Remote Alarm Display, RAD __________________________6
8. EDM-960 Display Installation_____________________________________________________________7
9. EDM-960 Key Card Installation ___________________________________________________________8
10. EDM-960 in aircraft with wing-mounted engines _____________________________________________9
11. EDM-960 in aircraft with centerline thrust engines __________________________________________10
12. Wiring harness for 950 _________________________________________________________________11
13. Wiring harness for Display _____________________________________________________________11
14. Pressurized Aircraft wire Routing________________________________________________________12
15. Power Connection ____________________________________________________________________12
16. Probe Wiring _________________________________________________________________________12
17. Wiring Markings ______________________________________________________________________13
18. Exhaust Gas Temperature Probe (EGT) Installation _________________________________________13
19. Turbine Inlet Temperature (TIT) Probe Installation (optional) _________________________________14
20. Cylinder Head Temperature (CHT) Probe Installation ________________________________________14
21. Outside Air Temperature (OAT) Probe Installation __________________________________________15
22. Compressor Discharge Temp Probe Installation (optional) ___________________________________15
23. Carburetor Probe Installation (optional)___________________________________________________15
24. Oil Temperature Probe Installation _______________________________________________________15
25. Oil Pressure Sensor Installation _________________________________________________________15
26. Ammeter Shunt Installation _____________________________________________________________17
27. General Fuel Flow Transducer Installation_________________________________________________18
28. Fuel Level Interface Installation _________________________________________________________19
28.3 Fuel Tank Calibration __________________________________________________________________21
29. Capturing the sender reading at each calibration point: _____________________________________22
30. GPS Interface ________________________________________________________________________25
31. Manifold Pressure (MAP) Sensor ________________________________________________________26
32. RPM Sensor installation________________________________________________________________27
33. EDM-960 system Specifications and Limitations____________________________________________28
34. EMI Radio Test:_______________________________________________________________________29
35. Component Parts List__________________________________________________________________30
36. Weight and Balance Data_______________________________________________________________32
37. Pilot Programming ____________________________________________________________________32
38. Programming the K factor ______________________________________________________________35
39. Trouble Shooting _____________________________________________________________________36
40. Connector Pin Assignments EDM-950, J1 through J5 _______________________________________37
41. P8 Harness Display PN 790807 __________________________________________________________43
42. Interconnection between Display, DAU’s and GPS __________________________________________46
43. Instructions for Continued Airworthiness (ICA) ___________________________________________46
The Owner of the EDM-960 must keep this manual
J.P. INSTRUMENTS
PO BOX 7033
HUNTINGTON BEACH CA
Last printed 5/8/2014 1:08:00 PM

Summary of content (46 pages)