User's Manual

17
PageCreated:05‐04‐2010
Revised:N/A
TechnicalManual(076100037818)
INSTALLATIONINSTRUCTIONS
VISUAL INSPECTION: Beforeinstallingtheunit,checkthecontainerandthemachinefordamage.A
damagedcontainermaybeanindicationthereispossibledamagetotheproduct.Ifthereisanytypeofdam‐
agetoboththecontainerandtheunit,DONOTTHROWAWAYTHECONTAINER. The dish‐machine has
beenpreviouslyinspectedatthefactoryandisexpectedtoarrive to you in new, undamaged condition.
However,roughhandlingbycarriersorothersmayresultindamagetotheunitwhileitisintransit.Ifsuch
asituationoccurs,DONOTRETURNTHEUNITTOTHEMANUFACTURER.Instead,contactthecarrierand
askthemtosendarepresentativetothesitetoinspectthedamage.Youshouldrequestthataninspection
reportbecompleted.Youmustcontactthecarrierwithin48hoursofreceivingthemachineinordertore‐
portpossiblefreightdamage.Youarealsoencouragedtocontactthedealerthroughwhichyoupurchased
theunit.
UNPACKING THE MACHINE:Themachineshouldbeunboxedandremovedfromthepalletprior to
installing. Also remove the wooden lift beams and their associatedbracketsaftertheunithasbeenposi
tioned.Openthefrontdoorandremoveallofthematerialsfromtheinside.Onceunpacked,verifythereare
nomissingpartstothebestofyourability.Ifyoudiscoverapartismissing,contactthemanufacturerimme‐
diately.
LEVELTHEDISHMACHINE:Thedishmachineisdesignedtooperatewhilelevel.Thisisimportantto
preventanydamagetothemachineduringoperationandtoensurethebestresultspossible.Theunitcomes
equippedwithadjustablebulletfeet,whichcanbeturnedusingapairofpliers.Verifytheunitislevelfrom
fronttobackandsidetosidepriortomakinganyelectricalorplumbingconnections.
PLUMBINGTHEMACHINE:Allplumbingconnectionsmustbemadetoadheretolocal,state,territorial
andnationalcodes.Theinstallingplumberisresponsibleforensuringtheincomingwaterlinesarelushed
ofdebrispriortoconnectingtothemachine.Notethatchipsandmaterialsfromcuttingprocessescanbe
comelodgedinthesolenoidvalvesandpreventthemfromopeningorclosing.Anyvalvesthatarefoundto
befouledordefectivebecauseofforeignmatterleftinthewaterline,andanysubsequentwaterdamage,are
nottheresponsibilityofthemanufacturer.
Waterhardnessshouldbeamaximumof6grainspergallon.Hardwatershouldbetreatedpriortobe
usedbythemachine.Ironinthewaterlinecancausestaining.Ailterdesignedtoremoveironfromthewa‐
tersupplyishighlyrecommendedforsuppliesinexcessof0.1ppm.
Yourdish‐machinecomeswithaWaterPressureRegulatingValve.Theunitutilizesalowpressureof
15PSIfortheincomingwaterline.Donotconfusestaticpressurewithlowpressure.Staticpressureisthe
pressurewhenthereisnolowandthevalvesareclosed;lowpressureiswhenthewaterisrunninginto
themachine.TheWPRVshouldbeadjustedtotheproperlowpressureataminimum.
Thewatersupplylineshallbe1/2NPTminimumandmustbeabletoprovidewaterattheminimum
temperatureindicatedonthemachinedataplate.
Itisrecommendedashutoffvalvebeinstalledtoallowisolatingthedish‐machinefromthewatersys‐
temintheeventmaintenanceorotheractivitiesrequireit.Also,itissuggestedthatashockabsorberbein‐