Installation Sheet
j a c l o i n d u s t r i e s | 129 Dermody Street Cranford, NJ 07016
p 908.653.4433 | 800.852.3906 f 908.653.1717 | 800.852.4133
Confidence from start to finish.
®
REVISED 3.09.18
JACLO.COM
|
PG 1
INSTALLATION
These kits are equipped with a built in positive shut-off valve. They are not mixing valves.
Any of JACLO’s pressure balance valves or JACLO’s 1/2" thermostatic valves with built in
volume controls can be used as the primary positive shut-off and mixing valve for a
temperature control.
1. Install a 1/2” NPT pipe nipple so that it extends 5/16” to 1/2” beyond the nished wall
when fully tightened.
2. Run water through system to ush out dirt and debris.
3. Use appropriate sealant when threading xture onto pipe nipple.
4. Connect the hose to the body and to the handshower; hang up handshower.
5. Pressurize the unit and check to ensure no leaks are present while under pressure and
while handshower is in use.
B042-646- B071-646-B043-646- B074-646-
INSTALLATION INSTRUCTIONS
Bidet Handshower Kits with Positive Shut-Off
Part #’s: B042-646-, B043-646-, B071-646-, B074-646-