Installation Sheet

j a c l o i n d u s t r i e s | 129 Dermody Street Cranford, NJ 07016
p 908.653.4433 | 800.852.3906 f 908.653.1717 | 800.852.4133
Confidence from start to finish.
®
REVISED 3.09.18
JACLO.COM
|
PG 1
INSTALLATION
These kits are equipped with a built in positive shut-off valve. They are not mixing valves.
Any of JACLO’s pressure balance valves or JACLO’s 1/2" thermostatic valves with built in
volume controls can be used as the primary positive shut-off and mixing valve for a
temperature control.
1. Install a 1/2” NPT pipe nipple so that it extends 5/16” to 1/2” beyond the nished wall
when fully tightened.
2. Run water through system to ush out dirt and debris.
3. Use appropriate sealant when threading xture onto pipe nipple.
4. Connect the hose to the body and to the handshower; hang up handshower.
5. Pressurize the unit and check to ensure no leaks are present while under pressure and
while handshower is in use.
B042-646- B071-646-B043-646- B074-646-
INSTALLATION INSTRUCTIONS
Bidet Handshower Kits with Positive Shut-Off
Part #’s: B042-646-, B043-646-, B071-646-, B074-646-

Summary of content (2 pages)