Installation Guide

Table Of Contents
Installation
English
www.jacuzzi.com Page 5
Framing and Support
READ ALL INSTALLATION INSTRUCTIONS COMPLETELY. IMPROPER INSTALLATION WILL VOID THE WARRANTY.
The oor structure beneath the bathtub must be able to support the total weight of the bathtub, water and bather. Consult
a structural engineer.
IMPORTANT!
Make sure that walls and oors meet re safety requirements of local building code and/or FHA/HUD Minimum Property
Standards.
Observe all governing codes and ordinances.
1. Proper installation is your responsibility. Have a qualied technician
install this bath.
2. Installation using a ground-fault circuit-interrupter (GFCI) is
required.
3. It is the customers responsibility:
• To contact a qualied electrical installer.
• To ensure that electrical installation is adequate and in
conformance with National Electrical Code (NEC).
The Technical Specications can be found at www.jacuzzi.com/baths/
support/.
Frame out the space where the bathtub is to be located. The follow-
ing should be taken into consideration when preparing the area:
Dimensions provided on rough-in diagrams are nominal.
Measure your actual unit upon receipt and build according to the
actual dimensions.
Finished alcove must have correct interior dimensions, as shown
in the key dimension section in the Technical Specications
Sheet, to properly install unit.
For three wall alcove installations, use an integral molded three-
sided tiling ange bathtub. When using the optional tile ange,
refer to instructions that are included with kit.
In remodeling, if necessary, add studs at each end to provide a
vertical nailing surface for the side nailing anges of bath xture
product.
To avoid obstructions during installation make sure that supply
lines, spout pipe and valve plumbing do not project into alcove.
Bathtubs require a 6" x 12" (150 mm x 305 mm) oor opening for the 1 ½" (38 mm) drain, waste and overow (DWO)
kit.
Be sure oor opening location matches bathtub xture drain location.
Use of casting plaster/plaster of paris (foundation material) is recommended
in all commercial structures (i.e. hotels, motels, dormitories, health clubs,
etc.).
The unit must be supported from the bottom of the bathtub and not from the
bathtub rim.
Per UPC code, access must be provided to the pump/motor for your specic model (Figure 1 and Figure 2).
Provide adequate ventilation for cooling and supply sufcient air for the pump/motor. Do not insulate around the
equipment.
It is the responsibility of the installer, building contractor or owner to provide access for service. Jacuzzi is not respon-
sible for any costs relating to obtaining access for repair. The owner shall bear such costs and, if appropriate, must
seek recovery from the installer.
Blower or
Pump Motor
Access
location
example
Access
location
example
A
B
Fig. 1
Blower or
Pump Motor
Access
Location
Examples
Access
Location
Examples
A
B
Fig. 2
A = Primary access (required)
B = Secondary access for equipment (optional)
Illustrations above shown with framing exposed
for clarity.
IMPORTANT: Left hand unit access is on the
opposite side (mirror)