Installation Sheet
Page6 www.jacuzzi.com InstallationandOperation
English
SignatureSeries
SignatureSeries
OptionalHeater
Suboor
DANGER
Riskofelectricshock.Connectonlytoacircuitprotectedbya
GFCI(Figure2).
CAUTION
Electricaloutletmustbemounted4˝(101mm)abovetheoor
lineand12"max(305mm)insidefromtheedgeofthebathtub
(Figure2),orinaccordancewithlocalbuildingandelectrical
codes.
Riskofcomponentoverheat.Donotuseelectricextensioncord
topowerthisunit.Operatingthepumpwithoutenoughwaterin
thebathtubcancausepermanentdamagetothepump/motor.
IftheGFCIunitindicatesamalfunction,permanufacturer’s
instructions,turnOFFpoweranddonotattempttousethe
bathtubuntilthesourceoftheproblemhasbeenidentiedand
corrected.
Electrical Connections
Installation Procedures
Framing and Support (Cont)
1 Preparethesuboorforthedrainandensurethattheareaislevel.Thedrain/overowofthebathtubextends
belowthebottomofthebathtub.IdentifythedrawingintheTechnicalSpecicationsManualthatcorresponds
withyourbathtub.
2 Jacuzzi’sTru-Level™baseisastandardfeatureonallbathtubs.Ifthesuboorislevelandacontinuoussurface,
nootherpreparationisnecessary.Proceedtothe“InstallationProcedures”section.
3
Ifthesuboorisnotlevel,youmustleveltheentiresurfacepriortoinstallingthebathtub.
4 Ensurethattheoorislevelandcansupportaloadof50lbs.persquarefoot.
5 Thebathtubmustremainlevelinorderforittodrainproperlyandmustmakecontactwiththelevelingmaterial.
NOTES
Whenusingelectricalproducts,basicprecautionsshouldalwaysbefollowed:
•Alwaysfollowlocalbuildingandelectricalcodes.Groundingisrequired.Theunitshouldbeinstalledandgrounded
byaqualiedelectrician.
•Adedicated,120VAC,15AmpGFCI-protectedcircuitisrequiredforthepump/motor.Ifthebathtubwaspurchased
withaheaterinstalled,aseparate120VAC,15AmpGFCI-protectedcircuitisrequired.Bondinglugsareprovidedon
themotorandheatertosatisfylocalelectricalcodes.
1
Makesureframed-inalcoveisofpropersizeper
Jacuzzidimensions,square,andplumb;checkoor
forlevelness(Figure3).Rough-inshouldbekeptto
aminimumuntiltheunitisonthejobsite.
Measurementsmayvary+0or-⅜"fromoriginal
specications.
2 Sufcientclearancemustbeprovidedforaccess
toserviceconnections(pump/motor,controls,
heaterplumbingandelectricalhookups).
NOTE
Thefollowingsteps(A,BandC)willdirectyouinhow
besttoinstallthebathtub,dependingonyourinstallation
environment.
4˝
(101mm)
Fig. 2
Fig. 3
Level
12˝
(305mm)