Installation Sheet
Page8 www.jacuzzi.com InstallationandOperation
English
SignatureSeries
SignatureSeries
Applyacontinuousbeadofsiliconesealantaroundtheentireseam
betweenthecounterandthebathtubrim.Allowsealanttocure
accordingtomanufacturer’sinstructions.
3
Inabucket,mixfoundationmaterial.Placealargemound
ofplasteronthesuboor,intheapproximatelocationofthe
tubbottomcenter.Themoundsshouldbeplacedhigh
enoughsothatwhenthetubisset,itwillcausetheplaster
todisplaceandspread.Replaceunitintoalcovewith
frontskirtrmlyonoor.Makecertainthatbackledgeof
tubrestsrmlyonledgersupports.Levelunitandshim
ledgerifnecessary.Thebathtubmustbelevel.
NOTE
Bottomsupportmaterials:Castingplaster/plasterofparis(herein
referredasfoundationmaterials)arenotnecessarybutitsuseis
highlyrecommendedforarmerbottomsupport.
4 Fasteners:Towoodframing–predrillangeswitha
⅛"(5mm)carbidebitandfastenwith#8x1½"(38mm)
selftappingsheetmetalscrews;toconcrete/blockwalls
use1"(25mm)concretenailswithnailingtoolorimpact.
NOTE
Pre-drillingandnailingangesisrecommendedtoavoidcracking
oftheacrylicunit.Siliconethetopofeachfastenertoinsurewater
tightness.
Installation Procedures (Cont)
Rimof
Bathtub
Deck/Counter
Support
Frame
Plywood
Frame
Plywood
Rimof
Bathtub
LedgerBoard
Frame
Plywood
Deck/Counter
Fig. 8
Fig. 9
CAUTION
Donotuseanadhesiveoradhesivesealanttosecurethe
countertothebathtub.Ifmaintenanceorremodelingis
required,thecountermayhavetoberemoved.Adhesivewill
permanentlybondthecountertothebathtub.Carefully
positionthedeck/counteroverthebathtub.Follow
manufacturer’sinstructionstodeterminecuretime.
C. Undermount Installation
1. Preparethecutoutholeforthedeck/counterand
bathtubusingtheprovidedtemplate.
NOTE
Pleasefollowtheinstructionslistedonthetemplate(included)
tocorrectlymarkthecutouthole.Thetemplatemayshow
guidesformorethanonebathtub,becertaintoselectthe
appropriateguidelines.Ifundermountingisanoption,be
carefultoselecttheguidelinesthatapplytotheinstallation
thatyouareperforming.
Usethefollowingstepsforundermountasfollows:
2. Positionthebathtubtemplatesothatthedesired
undermountguidelinesarealignedwiththerimedge
(Figure4).
3.Attachthedeck/supportboardstotheplatformusing
appropriatehardware(Figure8-inset).The
deck/countersupportboardsmustbelevelwiththerim
ofthebathtub.
4. Attachdeck/countertothesupportboardsusing
suitableadhesive.Donotuseadhesivetoattachthe
deck/countertotherimofthebathtub.
5. Cleananydirtordebrisfromthetopofthebathtub
rim.Securethedeck/countertobathtubbyapplyinga
beadofsiliconesealantaroundtheentirerimof
bathtub(Figure9-inset).