Installation Guide
Primó™Collection
InstallationandOperation www.jacuzzi.com Page7
Primó™Collection Primó™Collection
English
1
Makesureframed-inalcoveisofpropersizeperJacuzzi
dimensions,square,andplumb;checkoorforlevelness
(Figure3).Rough-inshouldbekepttoaminimumuntilthe
unitisonthejobsite.Measurementsmayvary+0or-¼"
fromoriginalspecications.
2 Sufcientclearancemustbeprovidedforaccesstoservice
connections(pump/motor,controls,heaterplumbingand
electricalhookups).
NOTE
Bottomsupportmaterials:Castingplaster/plasterofparis(herein
referredasfoundationmaterials)arenotnecessarybutitsuseis
highlyrecommendedforarmerbottomsupport.
3 Inabucket,mixfoundationmaterial.Placealargemoundof
plasteronthesuboor,intheapproximatelocationofthetub
bottomcenter.Themoundsshouldbeplacedhighenoughso
thatwhenthetubisset,itwillcausetheplastertodisplace
andspread.Replaceunitintoalcovewithfrontskirtrmlyon
oor.Makecertainthatbackledgeoftubrestsrmlyon
ledgersupports.Levelunitandshimledgerifnecessary.The
bathtubmustbelevel.
Installation Procedures
Fig. 3
Fig. 5
A. Drop In Installation
1.Placeapieceofscraplumberoneachoftheendsof
thecutout–thiswillbeusedasatemporarysupport
priortoloweringthebathtubfullyintotheopening
(Figure4).
2.Installtheunit,insertingthemotor/pumpendrst,
loweringthebathtubintotheopeningasshownin
theillustration.
3.Thebathtubmustbesetlevel.Tocheck,usealevel
ontopoftheledgesonbothendsoftubandontop
ofthreshold(Figure5).
4.Caulkaroundtheperimeterofbathtubtosealthe
spacebetweentherimandthenisheddeck
B. 3-Wall Alcove Installation
1.Placethetubinthealcovewiththefrontskirtrmly
ontheoor.Thebathtubmustbesetlevel.Tocheck,
usealevelontopoftheledgesonbothendsoftub
andontopofdam(Figure6).
2.Afterlevelingtub,markeachstud(concreteorblock
wall)immediatelyabovethebackhorizontalange.
Removetubfromalcove.Measurethedistance
betweenthetopofthebackhorizontalangeandthe
bottomofthetubledgeapproximately1½"(40mm).
Carefullymarkthisdimensiononthebackstuds(or
wall),belowtherstmark(Figure6inset).
3.InstallaLedgerStrip:Jacuzzimandatestheuseof
supportsundertherearledgesofbathtubstoprevent
shifting.Usehorizontalledgerstripalongtheentire
rearledgeor“I”,“T”supportsinatleasttwoplacesin
verticalposition.Naila1"x3"x60"
(25mmx75mmx1525mm)ledgerstripimmediately
belowthelowermarksmadeonframing
(Figure6-inset).
ScrapLumber
Level
Level
Fig. 4
Fig. 6
Topof
LedgerStrip
Ledger
Board
1.50"