Installation Guide

52
Horizontal HardieTrim
®
Batten joints must occur at the same location as horizontal joints in HardiePanel
®
siding.
Install horizontal HardieTrim Batten joints by using one of the following options:
HORIZONTAL JOINT TREATMENT
Water-resistive
barrier
Flashing
Upper panel
Lower panel
Decorative
band board
Water-resistive
barrier
Upper panel
1
/4-in. Gap
Water-resistive barrier
Upper panel
Lower panel
1
No Horizontal Band-Board
2
Horizontal Band-Board
Water-resistive barrier
HardieTrim
Batten
22.5 - 45°
weather cut
HardieTrim
Board used as
Band-Board
Flashing
1
/
4-in. Gap
Don’t caulk gap
between flashing
and upper panel.
Upper
panel
HardieTrim
Batten
HardieTrim
Batten
HardieTrim
Batten
HardieTrim
Batten
Don’
upper panel.
t caulk
gap between
ashing and
Lower panel
1) If HardieTrim Battens are going
to be installed over horizontal panel
joints without the use of a horizontal
band board, follow the procedure as
illustrated in fig. 8.26. Start installing
HardieTrim Battens by creating
a weather-cut of at least a 22.5°
angle, making a joint at the same
location as the panel joint. Attach
the bottom batten. Make sure the
top batten has a matching weather-
cut and then install top batten.
2) If HardieTrim Battens are to be
installed over horizontal panel joints
with the use of a horizontal band
board, follow the procedure as
illustrated in fig. 8.27. If HardieTrim
Battens are to be installed
horizontally, they must be installed
in the same manner as in fig. 8.27.
Make sure the horizontal Z-flashing
is installed over both the lower panel
and the horizontal band board.
Attach the bottom batten tight to
the bottom edge of the band board.
Next, leaving a minimum 1/4 in.
gap above the horizontal Z-flashing,
install the top batten.
Water-resistive
barrier
Flashing
Upper panel
Lower panel
Decorative
band board
Water-resistive
barrier
Upper panel
1
/4-in. Gap
Water-resistive barrier
Upper panel
Lower panel
1
No Horizontal Band-Board
2
Horizontal Band-Board
Water-resistive barrier
HardieTrim
Batten
22.5 - 45°
weather cut
HardieTrim
Board used as
Band-Board
Flashing
1
/
4-in. Gap
Don’t caulk gap
between flashing
and upper panel.
Upper
panel
HardieTrim
Batten
HardieTrim
Batten
HardieTrim
Batten
HardieTrim
Batten
Don’
upper panel.
t caulk
gap between
ashing and
Lower panel
8.26
8.27
WARNING
Do not bridge floors with HardieTrim Battens and/or HardiePanel Siding.
A horizontal joint should always be created between floors.
!
General
Product
Information
Working
Safely
Tools for
Cutting and
Fastening
General
Installation
Requirements
General
Fastener
Requirements
Finishing and
Maintenance
HardieTrim®
Boards/Battens
HardieWrap®
Weather Barrier
HardieSoffit
®
Panels
HardiePlank
®
Lap Siding
HardieShingle
®
Siding
HardiePanel
®
Vertical Siding
Appendix/
Glossary
ESR-1844 &
2290 Report
Installation of HardieTrim
®
Battens (continued)