TESTING CNAS L0095 L Page 1 of 14 4 Pages No.: RZUN2020-1593 TE EST REP PORT UN38.3 NAME OF O SAMPL LE: Li-ion n Recharge eable Battery CLIENT: ICON N ENERGY Y SYSTEM (SHENZH HEN) CO.,L LTD ( CLASSIF FICATION N OF TEST T: ) Commission Test Vka an Certiffication & Testin ng Co., L Ltd.
TE EST REP PORT No.:RZUN N2020-1593 Page 2 of 14 Page es Typ pe/Model: : IBA0 001GA 7,2 26V 5000mA Ah 36,3Wh Name of samples: s Li-io on Recharge eable Batteryy : Color: Blu ue : Ph hysical shape e:Cylindrical Commissioned by: ICON EN NERGY SY YSTEM (SHENZHEN) CO.,LTD D : ( ) Commissioner address:201, 301, 401, 4 501 of Plant P B and 201, 301, 3 401, 50 01, No.4 Gua anqing Road d, Luhu Communitty, Guanhu u Street, Longhua District, D Shenzhen n City, Guang gdong Provin nce, P. R. Ch hina.
Ref. No.:RZUN2020-1593 Description and illustration of the sample: : The samples status is good Cell Dimensions/ Test item Page 3 of 14 Pages : 18mm×65mm Sample No. b1#~b4# T.1~T.5 b5#~b8# c1#~c5# T.6 c6#~c10# b1#~b4# T.7 b5#~b8# c11#~c20# T.
Ref. No.:RZUN2020-1593 Page 4 of 14 Pages Photos of Samples and Labels/ Battery/ IBA001GA 7,26V 5000mAh 36,3Wh LTC-R-4279-UN38.
Ref. No.:RZUN2020-1593 Page 5 of 14 Pages Photos of Samples and Labels/ Inner Cell/ ICR18650-26J 3,63V 2600mAh LTC-R-4279-UN38.
Ref. No. :RZUN2020-1593 Page 6 of 14 Pages ST/SG/AC.10/11/Rev.6/Amend.1/Section 38.3 Clause 38.3.4 Requirements Result Verdict Procedure/ Test 1: Altitude simulation/ 1 Test cells and batteries shall be stored at a pressure of 11,6kPa or less for at least six hours at ambient temperature (20±5 )/ 20±5 11,6kpa 6 Requirement/ 38.3.4.
Ref. No. :RZUN2020-1593 Page 7 of 14 Pages ST/SG/AC.10/11/Rev.6/Amend.1/Section 38.3 Clause Requirements Test 3: Vibration/ Result Verdict 3: 1 Cells and batteries are firmly secured to the platform of the vibration machine / 2 The vibration: a sinusoidal waveform with a logarithmic sweep between 7Hz and 200Hz and back to 7Hz traversed in 15 minutes/ 7Hz 200Hz 7Hz 15 3 For cells and small batteries: from 7 Hz a peak acceleration of 1gn is maintained until 18Hz is reached.
Ref. No. :RZUN2020-1593 Page 8 of 14 Pages ST/SG/AC.10/11/Rev.6/Amend.1/Section 38.3 Clause Requirements Test 4: Shock/ Result Verdict 4: 1 Test cells and batteries shall be secured to the testing machine/ 2 Each cell shall be subjected to a half-sine shock of peak acceleration of 150 gn and pulse duration of 6 milliseconds. Large cells may be subjected to a half-sine shock of peak acceleration of 50 gn and pulse duration of 11 milliseconds.
Ref. No. :RZUN2020-1593 Page 9 of 14 Pages ST/SG/AC.10/11/Rev.6/Amend.1/Section 38.
Ref. No. :RZUN2020-1593 Page 10 of 14 Pages ST/SG/AC.10/11/Rev.6/Amend.1/Section 38.3 Clause Requirements Test 6: Impact / Crush / 6: Result Verdict P / Impact (applicable to cylindrical cells not less than 18mm in diameter) / 18 1 This test sample cell or component cell is to be placed on a flat smooth surface/ 2 A 15,8 mm diameter bar is to be placed across the center of the sample, A 9,1kg mass is to be dropped from a height of 61±2,5cm onto the sample.
Ref. No. :RZUN2020-1593 Page 11 of 14 Pages ST/SG/AC.10/11/Rev.6/Amend.1/Section 38.
195,295 195,450 195,246 195,692 195,268 195,441 195,530 195,383 b2# b3# b4# b5# b6# b7# b8# (g) Mass prior to test / b1# Sample No. 8,366 8,368 8,368 8,366 8,364 8,366 8,362 8,368 (V) OCV prior to test / Ref. No.:RZUN2020-1593 0,001 0,001 0,001 0,001 0,001 0,002 0,001 0,001 Mass loss(%) (%) 99,94 99,95 99,94 99,95 99,94 99,94 99,94 99,95 Change ratio (%) Test 1: Altitude simulation/ 1 1.
Test 8: Forced discharge / 8: Test 7: Overcharg e/ 7: Test 6: Impact/ 6 OCV prior to test / (V) OCV prior to test / (V) Sample No. Sample No. OCV prior to test / V Sample No. OCV prior to test / V Temp. ( ) ( ) Sample No. Ref. No.
Ref. No. :RZUN2020-1593 Page 14 of 14 Pages Important The test report is invalid without the official stamp of CVC. Nobody is allowed to photocopy or partly photocopy this test report without written permission of CVC. The test report is invalid without the signatures of Ratifier, Reviewer and Testing engineer. The test report is invalid if altered, Objections to the test report must be submitted to CVC within 15 days, The test report is valid for the tested samples only.