User's Manual

RADIOBAND SYSTEM INSTALLATION MANUAL V2.2 / 21
JCM TECHNOLOGIES S.A. ALL RIGHTS RESERVED
3. AUTO-TEST FUNCTION
3.1 AUTO-TEST DESCRIPTION
Before starting operations, the control panel must check that the entire security
system is working correctly.
To make this check, the panel must act on the auto-test signal.
AUTO-TEST timing correct
AUTO-TEST timing error
While the auto-test is being run to learn of the status of the RADIOBAND/T, the
RADIOBAND/R questions the status of the different Safety edges. This process
ensures the correct working order of the following parts:
Safety edge
RADIOBAND/T (1 or several).
RF Channel (if there is any interference)
RADIOBAND/R (control and RF)
Autotest
CS
RADIOBAND/T status
Auto-test carried out
Autotest OK
T
autotest
T
end
The operation can now be
carried out
Autotest
CS
RADIOBAND/T status
Auto-test carried out
Autotest Error
T
MAXautotest
T
end
THE OPERATION CANNOT BE STARED AS
THE AUTO-TEST HAS NOT BEEN
SUCCESSFULLY COMPLETED