Instructions / Assembly

INSTALLATION INSTRUCTIONS
for Vinyl Patio Doors without Nailing Fin (JII015)
5
d. Apply the sill
pan piece of
self-adhesive
ashing over
the sill pan as
shown. The
bottom of the
sill pan should
be sealed by the
ashing.
e. Remove the
upper end
corner of each
side piece, and
for step-down
landings,
remove the
lower end
corner.
f. Apply the
side pieces of
self-adhesive
ashing.
g. Remove the
corners of the
header piece
and apply.
3. Apply sealant across
ashing/masonry
joints at corners of
masonry opening.

to all ashed surfaces
to be covered by
stucco.
PREPARE BUCK (MASONRY/BLOCK WALL ONLY)
1. On the exterior, coat the buck and surrounding concrete/masonry

for application procedures.
2. Seal the joint between the buck and the concrete/masonry with
JELD-WEN self-adhesive ashing as follows:
Note! Do not allow gaps or bubbles beneath the ashing (remove and
replace if necessary).
 
of self-adhesive
ashing for the
sill, sides, head,
and sill pan as
shown.
5

Top
= Step down only
3"
1.5
Rough opening side jamb +3"
Rough opening head/sill +3"
1.5
3"
Head piece
Side piece
Side piece
b. Apply the sill
piece as shown.
c. Place the sill pan
in the rough
opening.
Sealant