User guide

ASSEMBLY AND INSTALLATION INSTRUCTIONS
for Custom Wood & Fiberglass Exterior Folding Door Systems (JII101)
5
7. Seal back corners of
sill pan with sealant.
End of Stud-Framed
Wall Instructions,
continue with section
6, “INSTALL DOOR.”
5. Cut two pieces
of self-adhesive
ashing 6" wide by
the sill pan width +
3" long.
a. For continuous
slab landings
only, cut out the
inside corner.
b. Adhere the
pieces of
ashing to the
inside corners.
Stretch ashing
as needed to
cover corners
and lay at.
6. Smooth gaps or
bubbles beneath
self-adhesive
ashing with a
J-roller (remove
and replace if
necessary).
5
PREPARE STUD - FRAMED WALL - CONTINUED
Sill pan
width
3"
6"
Discard
(for
continuous
slab only)
Continuous Slab
Landing
Sill pan
width
3"
3"
Sealant
Step-Down
Landing
Sill pan
width
3"
3"
6
INSTALL DOOR
ASSEMBLE FRAME
1. On a clean and at
surface, carefully
position head,
jambs and sill with
the interior facing
down.
2. Run a bead of
silicone on all
surfaces of the sill
as shown. If gaskets
are provided,
adhere to both ends
of the sill. Repeat
silicone application
for the head where
the ends will
contact the jambs.
3. Clamp the frame corners as needed to ensure that the frame sections
t together ush and secure through the pre-drilled holes in the
jambs with the provided #10 x 2 1/2" at head screws.
INSTALL FRAME
Warning! To avoid injury, use at least two people to install.
1. Apply a 3/8"
continuous bead of
sealant across the sill
pan back dam.
2. Tilt the frame into
the rough opening.
Make sure the back of
the frame sill makes
solid contact with the
sealant on the sill pan
back dam. Adequately
support the frame
until fully installed.
SHIM THE JAMBS
Note! Secure all shims
with sealant.
1. From the interior,
shim the side and
head jambs 6" from
the corners and then
every 16" on center.
Also shim at the strike
plate(s) if applicable.
Align shims so that
strike plate screws
(installed later) will
each penetrate a shim.
2. Inspect the frame for
square, level, and
plumb (remove and
reinstall if necessary). The sill should be level and the head should
have a 1/8" upward bow.
Sealant
6"
6"
Interior
Sill
Jamb