How to Guide

Service Supplement
for Barn Door Bar Application (SVC-90004)
MATERIALS AND TOOLS
Precautions And Safety
Read and fully understand ALL manufacturer’s instructions before
beginning. Failure to follow proper installation and nishing instructions
may result in the denial of warranty claims for operational performance
problems.
Do not work alone. Two or more people are required. Use safe
liftingtechniques.
Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
Operate hand/power tools safely and follow manufacturer’s
operating instructions.
If disturbing existing paint, take proper precautions if lead paint is
suspected (commonly used before 1979). Your regional EPA (www.
epa.gov/lead) or Consumer Product Safety Commission ofces provide
information regarding regulations and lead protection.
WARNING: Drilling, sawing, sanding or machining wood products
generates wood dust, a substance known to the State of California to
cause cancer. Use a respirator or other safeguards to avoid inhaling
wood dust.
Hand fasten & tighten all fasteners with appropriate tool.
Only one door can be hung onto a track.
Materials And Door Handling
Allow doors to acclimate to local conditions for at least 24 hours before
nishing.
Store door in dry, well-ventilated area.
Do not drag the door on the oor.
Protect from exposure to direct sunlight during storage.
If injury occurs, immediately seek medical attention!
IMPORTANT INFORMATION
Materials and Tools Needed
Wood glue
Finish nails - #18 x 3/4"
Hammer
Tape measure
Barn Door Kits:
Horizontal SDL Bars
Diagonal SDL Bars
Diagonal SDL Bars
Horizontal SDL Bars
1-Panel Door with Loose Bars
6-Lite Door with Loose Bars
1-Panel Door 6-Lite Door

Summary of content (3 pages)