FINISH INSTALLATION
1.Drivetwo#10x3"
screws through
the open screw
holes in the strike
plate (included in
hardware pack).
2. Remove the pre-
installed screws
from the strike
plate and replace
them with the
remaining#10x3"
screws from the
hardware pack.
This will secure the
patio door to the
structure.
08/07
7
COMPLETE INSTALLATION - CONTINUED
AFTER INSTALLATION
1. Install exterior wall surface within seven days of patio door
installation.
2.Sealanygapsoropeningsatendofhorizontalmulljointswith
sealant.
3.Maintaingapof1/4"-3/8"betweendoorframeandnalexterior
wall surface (siding, stucco, etc.).
4.Sealthisgaponthesideswithbackerrodandsealant.Forstep-down
landings, also seal under the patio door sill. Do not apply sealant on
top of the drip cap.
5.Ontheinterior,insulatethevoidbetweentheroughopeningand
the door frame with backer rod and sealant or low expansion foam.
6. Protect recently installed units from damage from plaster, paint, etc.
by covering the unit with plastic.
Premium Patio Door
Replacement
screw
Pre-installed
screw
Pre-installed
screw
Builders Patio Door
Pre-installed
screw
Replacement
screw
Pre-installed
screw