Installation Guide
©2016 JELD-WEN, inc.; This publication and its contents are owned by JELD-WEN, inc. and are protected under the U.S. Copyright Act and other intellectual property laws. All trademarks, service marks, logos and the like
(whether registered or unregistered) are owned or controlled by JELD-WEN, inc. or others. Unauthorized use or duplication of JELD-WEN intellectual property is prohibited.
JELD-WEN reserves the right to change product specications without notice. Please check our website, jeld-wen.com, for current information. 07/16
Assembly and Installation Instructions
for Custom Wood, EpicVue
™
and Fiberglass Exterior Folding Door Systems (JII101)
Please visit jeld-wen.com for warranty and
care and maintenance information.
Thank you for choosing
5. Open and close the door system to check for smooth operation.
6. Remove the yellow shipping clips from the roller hinges and top pivot
blocks and make sure all locking pins are in their slots and are secure.
7. Insert the cap into
the pivot hinge leaf if
not alreadyinstalled.
FINISH INSTALLATION
1. Fully seat any fasteners not yet completely driven into the rough opening.
2. If the door has a strike jamb against a rough opening jamb, drive
#10 x 3" screws through the screw holes in the strike plate. Replace
existing screws if necessary. This will secure the door to the structure.
3. Install drip cap if required or desired. Fold the building wrap
(previously taped up) down over the drip cap and seal the cut ends
with self-adhered ashing or building wrap tape.
4. Some clad products
are shipped with
separate astragal
covers. If these are
not already installed,
wipe the panel area
with denatured
alcohol, let dry,
remove the backing
tape and adhere
intoplace.
AFTER INSTALLATION
1. Install exterior wall surface within seven days of door installation.
2. Maintain gap of 1/4"-3/8" between door frame and nal exterior
wall surface (siding, stucco, etc.).
3. Seal this gap on the sides with backer rod and sealant. For step-down
landings, also seal under the door sill, leaving a 1" gap every 12". Do
not apply sealant on top of the drip cap.
4. On the interior, insulate the void between the rough opening and the
door frame with backer rod and sealant or low expansion foam.
5. Protect recently installed units from damage from plaster, paint, etc.
by covering the unit with plastic.
6. Remove labels or other materials adhered to glass within 30 days
after installation.
MAKE FINAL ADJUSTMENTS - IF NECESSARY
1. Doors are adjusted at the factory and should not need additional
adjusting. Slide doors into the closed position and push the ush bolt
handles down to secure. Check for a 3/16" gap between the panels
and the head track, 3/8" gap between the panels and the sill track
and proper lock function.
2. Roller hinges and top
pivot blocks adjust
vertically using a at
head screwdriver.
Insert the screwdriver
into the bottom and
turn to the right to
raise and to the left
to lower. Adjust as
necessary to achieve
a consistent reveal
across the opening.
If the yellow
shipping clip is not
installed, pull the
locking pin down
while turning the
adjustmentscrew.
3. Top and bottom
pivots adjust
horizontally using
a Phillips head
screwdriver. Open
panel and adjust
until equal spacing
exists between the
panels and jambs.
Check to ensure
the lock functions
properly. If the
panels are too far
apart for the lock
to function, adjust
both ends equally
toward the center
until the lock
functionsnormally.
4. If the conguration
has the passage door
meeting with a strike
door, make sure the
doors are aligned
along the full height
of the door when
closed. If the doors
are not aligned, the
hinges may have to be adjusted vertically for the doors to align.
Top Pivot Block Shown from the Exterior,
Roller Hinges are Similar
COMPLETE INSTALLATION
7
Adjustment
screw
Panel
Locking pin
Yellow
shipping clip
Adjustment
screw
Adjustment
screw
Panel
Panel
Head
Sill
Active panel
Passive panel
(with astragal
attached)
Cover
Cover