Assembly and Installation Instructions
for Smooth-Pro
™
F-4500 Fiberglass Folding Wall System (JII-90076)
TEMPORARY FASTEN AND SHIM
To avoid injury, use at least 3-people to install. The
wall system MUST be supported at all times!
1. Position the wall system in front of the rough opening. NOTE: Frames
laid horizontally must be fully locked and protected before the
support buck is removed.
2. Remove the support buck from
around the frame.
NOTE: Fasteners may have
been seated through the frame
into the buck. Check the head
jamb channel and sill channel
for possible buck fasteners.
3. Tilt the wall system into the
rough opening and support
until fully fastened.
4. Position the wall system frame
so the bottom/sill portion of the wall system is centered within the
opening. If using a rigid sill pan, ensure the back of the sill is in
contact with the back dam of the sill pan.
5. Double-check the sill is level within the opening.
6. Adjust the top/head portion of the wall system frame from left to
right until the frame is square within the opening (reference the
Product Installation Tolerance Table).
7. Evaluate the wall system position within the opening for plumb, level,
square and twist.
8. Add additional shims as necessary to ensure proper support and
alignment of the wall system frame. Larger wall systems may need
additional shims. A shim is required at each fastening location to
prevent frame deection.
9. Temporarily fasten through the pre-drilled hole in the head jamb 4"
from each corner.
4"
4"
Product Installation Tolerance Table
Products must be installed in a manner that Does Not exceed the
tolerance below
Plumb +/- 1/8"
Level +/- 1/8"
Twist +/- 1/8"
Square +/- 1/8"