Instructions / Assembly

3
Installation Instructions
for Pre-Hung Exterior Entry Doors (JII106)
1
INSPECT PRODUCT
Remove Packaging
Remove shipping
materials such as corner
covers, shipping blocks
or pads. Remove any
staples exposed on the
frame, but leave glass
protective lms.
Skidboard
If the door unit includes packaging
or a skidboard under the threshold
and bottom end of the side jamb,
remove it.
If the door comes with a security
plate on the outside of the frame
at the strike, DO NOT remove it.
Install the door with the security
plateattached.
Sec
pla
urity
te
Inspect Door
Cosmetic and/or shipping damage.
Product squareness (diagonal measurements must be within
1/4"difference).
Manufacturing abnormalities (e.g., warp, bow, squareness).
Correct product (size, color, grid pattern, handing (side the hinges are
on), glazing, energy-efciency requirements, etc.).
If any of the above conditions represent a concern, or if you
expect environmental conditions to exceed the door’s performance
rating, DO NOT install the door. Contact your dealer or distributor
forrecommendations.