Spec Sheet

20
PREPARATION FOR USE
GENERAL
The Jenny Air Compressor unit was thoroughly tested at our factory as part of the
manufacturing process. The machine will function as designed if properly assembled, set up, and
operated. There are certain steps that must be taken prior to attempting to operate unit to assure it is
ready for operation.
INSPECTION OF NEW EQUIPMENT
1.) Check the box or crate for possible shipping damage.
If extensive damage is apparent to the box, please notify the freight carrier immediately. Do not open
the box. Wait for the freight carrier’s inspector to be present before opening.
2.) Open the shipping box and inspect for damage and missing components.
You should fi nd:
1 - Jenny Air Compressor
1 - Instruction Manual and Warranty Card(s)
1 - Spare parts bag (not included with all units)
Check all of the equipment against the packing list. Examine identifi cation plates for positive
identifi cation of the equipment received. If any of these components are missing, please notify the
distributor from whom the machine was purchased immediately.
Inspect the unit carefully for any possible hidden damage. If the unit or any of the components are
damaged, please notify the freight carrier immediately.
Do not attempt to repair or use the unit or any of the components
if the unit is damaged. Notify the distributor from whom the
machine was purchased immediately.
3.) Record the machine model number, serial number, and specifi cations located on the
machine. Always include unit model, unit serial number, and compressor model number when
ordering spare parts.
4.) Fill out the enclosed warranty card.
5.) Inspect for and tighten any loose nuts and/or bolts.
6.) Inspect the controls, instruments, and gauges for damage or loose mountings.
7.) Inspect all hoses for kinks and loose connections.
8.) Inspect electrical wiring for cuts, fraying, and loose connections.
!
WARNING