Instructions / Assembly

MODEL: 52WH254DP, 52WH254DPF,
52WH304P, 52WH304PF,
52WH304DP, 52WH304DPF
RECESSED MOUNTED,
STEEL MEDICINE CABINETS
INSTALLATION of CABINET
1. Carefully remove all packing material. Place
hardware packages, shelves and door aside until
needed. Hardware and shelves are located in the
llers identi ed by “Hardware enclosed” tape.
2. Determine desired location of cabinet on wall.
Mark wall to show wall opening size (see
dimension chart). Generally, the recommended
height to the center of the cabinet is 64” from the
oor. (Fig. 1)
3. CAUTION: Wall studs, plumbing or electrical lines
that interfere must be removed or relocated. Cut
wall opening, being careful not to damage the
surrounding wall surface. Insert framing to
support all plaster board edges.
4. Prepare the mounting screws by placing the
screws into the clear plastic bases. (Fig. 2)
5. Note: For ease of installation, an additional person is
recommended. Insert cabinet into wall opening.
(Fig.3) Ensure the cabinet is plumb and level. If
necessary use a carpenters level and shim corners of
cabinet. Secure to wall studs through the four (4)
mounting holes inside cabinet, using the screws that
have been placed into the plastic bases. (Fig. 4) Do
not over tighten the mounting screws as the body
side wall may bend and prevent proper shelf
installation. Only tighten screws until they are
ush with the body.
6. Snap the screw covers over the screw bases.
(Fig.5)
For help, call us
toll free!
1-800-637-1453
Fig. 3
Wall
Opening
Cabinet
Body
Fig. 4
Mounting
Screws
Mounting
screw into
mounting
hole
Fig. 1
Fig. 2
I
nsert screw
t
hrough clear
p
lastic base
Fig. 5
Snap on Cover
Cover
Base
Screw
INSTALLATION INSTRUCTIONS
MODEL WALL OPENING OVERALL SIZE
NO. W H D W H D
52WH254DP 19
1
/
4
24 4 20 25 5
52WH254DPF 19
1
/
4
24 4 20 25 5
52WH304P 23
1
/
4
29 4 24 30 5
52WH304PF 23
1
/
4
29 4 24 30 5
52WH304DP 23
1
/
4
29 4 24 30 5
52WH304DPF 23
1
/
4
29 4 24 30 5

Summary of content (8 pages)