Installation Guide
INSTALLATION INSTRUCTIONS
JC 01/10/2012
Architectural Pendants
PENDANT ASSEMBLY & INSTALLATION
1. If using aircraft cable suspension, install husk onto crown rst (Fig C).
2. If using lens bracket, attach to husk using supplied screws (Fig D).
3. If using hood, slide hood over reector/refractor/diffuser before mounting to husk (Fig E).
4. Secure reector/refractor/diffuser to husk using supplied plate & nuts (Fig F).
5. Insert proper lamp type/wattage. Refer to luminaire marking. (Fig G).
6. If using lens, mount to lens bracket & attach using supplied nuts (Fig G)
Note: T6 lamping requires use of lens.
7. For Incandescent, GU24, and Metal Halide: Connect white wire to white wire, black wire to black
wire (The green wire is already grounded) (Fig I).
For GX24 socketed Fluorescent (6” and 9” diameter shades only): Connect blue to blue and red to
red. Two of each, there is no polarity within the colors (Fig I).
8. Attach suspension system to husk using supplied screws (Fig J)
CAUTION - RISK OF ELECTRICAL SHOCK
MAKE CERTAIN LEADS ARE NOT PINCHED BETWEEN PARTS.
Fig C
Fig G
Fig D
Fig H
Fig E
Fig I
Fig F
Fig J
Note: Installation steps and components may vary
depending on various types of custom installation
3
66-25 Trafc Avenue • Glendale NY 11385
Tel: 718.366.3211 Fax: 718.366.3646
219 South 6th Avenue • City of Industry • CA 91746
Tel: 626.333.3661 Fax: 626.333.2955
jescolighting.com
Technical Support: 855.592.0029
Email:support@jescolighting.com