Service Manual

SECTION 6 - TROUBLESHOOTING
3121231 – JLG Lift – 6-39
6.12 MAIN POWER CIRCUIT TROUBLESHOOTING
Machine Will Not Power Up
Check For These Obvious Conditions First:
Battery voltage is 24 volts. (Sufficient Charge in Batteries to Operate Machine)
Positive (+) and negative (–) battery cable connections clean and tight at both the Batteries and the Ground Control Mod-
ule lugs.
Main Power Selector Switch (key) positioned to either Platform or Ground Control Mode.
Emergency stop buttons on both the Ground Control Module and the Platform Control Console in the RESET position
(out).
Table 6-43. Machine Will Not Power UP.
STEP ACTION SPEC YES NO
1. Check for 24V DC at the positive (+) and negative (–) main power cable
connections on the Ground Control Module.
24V DC Go to Step 2 Replace the 175
Amp Inline Fuse on
the Positive power
cable
2. Check continuity of the Emergency Stop wires running to the Platform Con-
trol Console, pins-10 and 1 on the P4 connector at the Ground Control Mod-
ule.
Replace the Ground
Control Module
Go to Step 3
3. Remove the 9-pin Platform Control Console connector at the Platform
Junction Box and check continuity between pins-1 and 2 to the Emergency
Stop Switch in the Platform Control Console cable.
Go to Step 4 Replace the
Platform Control
Console
4. Check continuity of the wires running from the P4 connector on Ground
Control Module to the Platform Junction Box;
P4 connector, Pin-1 to Junction Box Pin-2 and
P4 connector, Pin-10 to Junction Box Pin-1
Replace Platform
Control Console
Repair or Replace
Wiring