Operator Manual Manual

Section 5 - Attachments
5-2531200938
Installation Procedure:
Refer to Attachment Installation on page 5-10.
Operation:
Raise or lower boom to appropriate height and close bucket for loading material from
stockpile.
Align telehandler with face of stockpile and drive slowly and smoothly into pile to load
bucket.
Tilt bucket up far enough to retain load and back away from pile.
Travel in accordance with requirements set forth in Section 1 - General Safety
Practices.
Open bucket or tilt bucket down to dump load.
Equipment Damage Precautions
Except for lifting or dumping a load, the boom must be fully retracted for all bucket
operations.
Do not corner-load bucket. Distribute material evenly within the bucket. Bucket
capacity charts are for evenly distributed loads only.
Do not use bucket as a lever to pry material. Excessive prying forces could damage
bucket or machine structure.
Do not attempt to load material which is hard or frozen. This could cause severe
damage to quick attach or machine structure.
Do not use bucket for "back dragging." This could cause severe damage to quick
attach.