Operator Manual Manual

Section 5 - Attachments
5-1331200938
This installation procedure is designed for one-person operation. Prior to exiting cab,
perform “Shut-Down Procedure” on page 4-3.
1. Tilt quick attach forward to provide clearance.
Check to be sure lock pin and retainer pin is out.
2. Align attachment pin recess with attachment pin.
Raise boom slightly to engage attachment pin in
recess.
3. Tilt quick attach back to engage attachment.
4. Insert lock pin and secure with retainer pin.
5. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic Operated
Attachment” on page 5-16.
OAM2780
O
AM2790
OAM2800
OAM2810