Service Manual Instruction Manual

SECTION 2 - SERVICE PROCEDURES
2-4 JLG Lift 3120782
Footnotes:
(1) Prior to use each day; or at each Operator change
(2) Prior to each sale, lease, or delivery
(3) In service for 3 months or 150 hours; or Out of service
for 3 months or more; or Purchased used
(4) Annually, no later than 13 months from the date of the
prior inspection
Inspection and Maintenance Codes:
1. Check for proper and secure installation.
2. Visual inspection for damage, cracks, distortion, or
excessive wear.
3. Check for proper adjustment.
4. Check for cracked or broken welds.
5. Operates properly.
6. Returns to neutral or "off" position when released.
7. Clean and free of debris.
8. Interlocks function properly.
9. Check for signs of leakage.
10. Decals installed and legible.
11. Check for proper fluid level.
12. Check for chafing and proper routing.
13. Check for proper tolerances.
14. Properly lubricated.
15. Torqued to proper specification.
16. No gouges, excessive wear, or cords showing.
17. Properly inflated and seated around rim.
18. Proper and authorized components.
19. Fully charged.
20. No loose connections, corrosion, or abrasions.
21. Verify.
22. Perform.
23. Sealed properly.
24. Overrides Platform controls.
25. Inspected per Service and Maintenance Manual.
Hydraulic Fluid * 11 11 11 11 11
Electrical Connections 20 20
Outrigger Interlock Systems 1, 2, 5 5
GENERAL
Operator and Safety Manuals in Storage Box 21 21 21
ANSI and EMI Manuals/Handbooks Installed 21 21 21
Capacity Decals Installed, Secure, Legible 21 21 21
All Decals/Placards Installed, Secure, Legible 21 21 21
"Walk-Around" Inspection Performed 22
Annual Machine Inspection Due 21
No Unauthorized Modifications or Additions 21 21
All Relevant Safety Publications Incorporated 21 21, 22
General Structural Condition and Welds 2, 4 2, 4
All Fasteners, Pins, Shields, and Covers 1, 2
Grease and Lubricate to Specifications 22 22
Function Test of All Systems 22
Paint and Appearance 77
Stamp Inspection Date on Frame 22
Notify JLG of Machine Ownership 22
Table 2-2. EL Model - Preventive Maintenance & Inspection Schedule.
AREA ON MACHINE
INTERVAL
PRE-START (1)
INSPECTION
WEEKLY
PREVENTATIVE
MAINTENANCE
3 MONTH
PREVENTATIVE
MAINTENANCE
PRE-DELIVERY (2)
OR FREQUENT (3)
INSPECTION
ANNUAL (4)
(YEARLY)
INSPECTION