Operator Manual Owner's manual
SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
6-24 – JLG Lift – 3121292
2. Tighten nuts in the following sequence: 3. The tightening of the nuts should be done in stages. Fol-
lowing the recommended sequence, tighten nuts per
wheel torque chart.
4. Wheel nuts should be torqued after first 50 hours of
operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.
Table 6-18. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage 2nd Stage 3rd Stage
40 ft. lbs.
(55 Nm)
100 ft. lbs.
(130 Nm)
170 ft. lbs.
(255 Nm)