Service Manual Instruction Manual
Table Of Contents
- Section A. Introduction - Maintenance Safety Precautions
- Section 1. Specifications
- Section 2. General
- Section 3. Chassis & Turntable
- 3.1 Tires And Wheels
- 3.2 Torque Hub
- Oil Information
- Roll and Leak Testing
- Tightening and Torquing Bolts
- Main Disassembly
- Output Carrier Disassembly
- Input Carrier Disassembly
- Hub-Spindle Disassembly
- Spindle-Brake Disassembly
- Cover Disassembly
- Cover Assembly
- Input Carrier Sub-Assembly
- Output Planet Gear Sub-Assembly
- Spindle - Brake Sub-Assembly
- Hub-Spindle Sub-Assembly
- Cover Sub-Assembly
- Main Assembly
- Integral Brake Check
- 3.3 Free Wheeling Option
- 3.4 Drive Motor
- 3.5 Oscillating Axle Bleeding Procedure and Lockout Test
- 3.6 Steer Adjustments
- 3.7 Swing Drive
- 3.8 Swing Bearing
- 3.9 Swing Brake - Mico
- 3.10 Rotary Coupling
- 3.11 Generator
- 3.12 Deutz D2.9 L4 Engine
- 3.13 Deutz D2011 Engine
- 3.14 Spark Arrester Cleaning Instructions
- 3.15 Glow Plugs
- 3.16 Deutz EMR 2
- 3.17 Bio Fuel in Deutz Engines
- 3.18 GM Engine General Maintenance
- 3.19 GM Engine Dual Fuel System
- Fuel Filter
- Direct Electronic Pressure Regulator (DEPR)
- Air Fuel Mixer
- Electronic Throttle Control (ETC)
- Electric Lock Off
- Engine Control Module (ECM)
- Heated Exhaust Gas Oxygen Sensor
- Gasoline Multi Point Fuel Injection System (MPFI)
- Gasoline Fuel Pump
- Gasoline Pressure And Temperature Sensor Manifold
- Fuel Filter
- Fuel Injector Rail
- Fuel Injector
- 3.20 GM Engine Fuel System Repair
- Propane Fuel System Pressure Relief
- Propane Fuel System Leak Test
- Propane Fuel Filter Replacement
- Direct Electronic Pressure Regulator (DEPR) Maintenance And Inspection
- Check/Drain Oil Build-Up In 2-Stage Vaporizer
- Air Fuel Mixer/Throttle Control Device Maintenance And Inspection
- Exhaust System And Catalytic Converter Inspection And Maintenance
- Temperature Manifold Absolute Pressure (TMAP) Sensor
- Throttle Body (ETC) Replacement
- Mixer Replacement
- Electronic Pressure Regulator (EPR) Replacement
- Regulator Replacement
- Coolant Hose Replacement
- Vapor Hose Replacement
- Engine Control Module Replacement
- Heated Exhaust Gas Oxygen Sensor Replacement
- 3.21 GM Engine LPG Fuel System Diagnosis
- Section 4. Boom & Platform
- Section 5. Hydraulics
- 5.1 O-Ring Lubrication
- 5.2 Cylinders - Theory of Operation
- 5.3 Cylinder Checking Procedure
- 5.4 Cylinder Removal and Installation
- Cylinder Locations
- Main Boom Telescope Cylinder Removal
- Main Boom Telescope Cylinder Installation
- Main Boom Lift Cylinder Removal
- Main Boom Lift Cylinder Installation
- Upright Level Cylinder Removal
- Upright Level Cylinder Installation
- Tower Boom Lift Cylinder Removal
- Tower Lift Cylinder Installation
- Tower Telescope Cylinder Removal
- Tower Telescope Cylinder Installation
- 5.5 Hydraulic Cylinder repair
- Tower Boom Lift Cylinder
- Cleaning and Inspection
- Assembly
- Upright Level Cylinder
- Cleaning and Inspection
- Assembly
- Master Cylinder
- Cleaning and Inspection
- Assembly
- Main Boom Lift Cylinder
- Cleaning and Inspection
- Assembly
- Main Boom Telescope Cylinder
- Cleaning and Inspection
- Assembly
- Tower Boom Telescope Cylinder
- Cleaning and Inspection
- Assembly
- Platform Level (Slave) Cylinder
- Cleaning and Inspection
- Assembly
- Jib Lift Cylinder (AJ Only)
- Cleaning and Inspection
- Assembly
- Steer Cylinder
- Cleaning and Inspection
- Assembly
- Axle Lockout Cylinder
- 5.6 Hydraulic Pump (Gear)
- 5.7 Variable Pump
- 5.8 Hydraulic Component Start-Up
- 5.9 Pressure Setting Procedures
- Section 6. JLG Control System
- Section 7. Basic Electrical Information & Schematics

SECTION 4 - BOOM & PLATFORM
4-4 – JLG Lift – 3121616
INSTALLATION
1. Use a suitable lifting device to position boom assembly
on turntable. Align pivot holes in boom and turntable.
2. Install boom pivot pin. Ensure location of hole in pin is
aligned with attach point on turntable.
3. Gently tap pin in position with soft headed mallet.
Install pin mounting hardware.
4. Connect all wiring connectors.
5. Connect all hydraulic lines running along side of boom
assembly.
6. Using all applicable safety precautions, operate lifting
device and position boom lift cylinder so holes in cylin-
der rod end and boom structure are aligned. Insert lift
cylinder pin. Ensure location of hole in pin is aligned
with attach point on boom.
7. Align holes in boom structure with hole in master cylin-
der. Insert master cylinder pin. Ensure location of hole in
pin is aligned with attach point on boom.
8. Using all applicable safety precautions, operate machine
systems and raise and extend boom fully. Note exten-
sion cycle performance.
9. Retract and lower boom. Note retraction cycle perfor-
mance.
4.2 TOWER BOOM
Remove Tower Upright
1. Tag and disconnect hydraulic lines to upper lift cylinder
(1). Use suitable container to retain any residual hydrau-
lic fluid. Cap hydraulic lines and ports.
2. Support upper lift cylinder using suitable lifting device.
3. Remove bolt and keeper pin from upper lift cylinder bar-
rel end pin (2). Remove pin using a suitable brass drift
and hammer.
4. Tag and disconnect hydraulic lines to master cylinder
(3). Use a suitable container to retain any residual
hydraulic fluid. Cap hydraulic lines and ports.
5. Remove bolt and keeper pin from master cylinder barrel
end pin (4). Remove pin using a suitable brass drift and
hammer.
6. Disconnect wiring hardness to two horizontal limit
switches (5) and dual capacity limit switch (6).
7. Support tower upright (7) with suitable lifting device.
8. Remove mounting hardware and hose bracket (8) from
tower upright.
9. Remove bolt and keeper pin from upright level cylinder
(9) barrel end pin (10). Remove pin using a suitable brass
drift and hammer.
10. Remove bolt and keeper pin from upright pivot pin (11).
Remove pin using a suitable brass drift and hammer.
Remove upright from tower boom assembly.