Service Manual Instruction Manual
Table Of Contents
- Section A. Introduction - Maintenance Safety Precautions
- Section 1. Specifications
- Section 2. General
- Section 3. Chassis & Turntable
- 3.1 Tires And Wheels
- 3.2 Torque Hub
- Oil Information
- Roll and Leak Testing
- Tightening and Torquing Bolts
- Main Disassembly
- Output Carrier Disassembly
- Input Carrier Disassembly
- Hub-Spindle Disassembly
- Spindle-Brake Disassembly
- Cover Disassembly
- Cover Assembly
- Input Carrier Sub-Assembly
- Output Planet Gear Sub-Assembly
- Spindle - Brake Sub-Assembly
- Hub-Spindle Sub-Assembly
- Cover Sub-Assembly
- Main Assembly
- Integral Brake Check
- 3.3 Free Wheeling Option
- 3.4 Drive Motor
- 3.5 Oscillating Axle Bleeding Procedure and Lockout Test
- 3.6 Steer Adjustments
- 3.7 Swing Drive
- 3.8 Swing Bearing
- 3.9 Swing Brake - Mico
- 3.10 Rotary Coupling
- 3.11 Generator
- 3.12 Deutz D2.9 L4 Engine
- 3.13 Deutz D2011 Engine
- 3.14 Spark Arrester Cleaning Instructions
- 3.15 Glow Plugs
- 3.16 Deutz EMR 2
- 3.17 Bio Fuel in Deutz Engines
- 3.18 GM Engine General Maintenance
- 3.19 GM Engine Dual Fuel System
- Fuel Filter
- Direct Electronic Pressure Regulator (DEPR)
- Air Fuel Mixer
- Electronic Throttle Control (ETC)
- Electric Lock Off
- Engine Control Module (ECM)
- Heated Exhaust Gas Oxygen Sensor
- Gasoline Multi Point Fuel Injection System (MPFI)
- Gasoline Fuel Pump
- Gasoline Pressure And Temperature Sensor Manifold
- Fuel Filter
- Fuel Injector Rail
- Fuel Injector
- 3.20 GM Engine Fuel System Repair
- Propane Fuel System Pressure Relief
- Propane Fuel System Leak Test
- Propane Fuel Filter Replacement
- Direct Electronic Pressure Regulator (DEPR) Maintenance And Inspection
- Check/Drain Oil Build-Up In 2-Stage Vaporizer
- Air Fuel Mixer/Throttle Control Device Maintenance And Inspection
- Exhaust System And Catalytic Converter Inspection And Maintenance
- Temperature Manifold Absolute Pressure (TMAP) Sensor
- Throttle Body (ETC) Replacement
- Mixer Replacement
- Electronic Pressure Regulator (EPR) Replacement
- Regulator Replacement
- Coolant Hose Replacement
- Vapor Hose Replacement
- Engine Control Module Replacement
- Heated Exhaust Gas Oxygen Sensor Replacement
- 3.21 GM Engine LPG Fuel System Diagnosis
- Section 4. Boom & Platform
- Section 5. Hydraulics
- 5.1 O-Ring Lubrication
- 5.2 Cylinders - Theory of Operation
- 5.3 Cylinder Checking Procedure
- 5.4 Cylinder Removal and Installation
- Cylinder Locations
- Main Boom Telescope Cylinder Removal
- Main Boom Telescope Cylinder Installation
- Main Boom Lift Cylinder Removal
- Main Boom Lift Cylinder Installation
- Upright Level Cylinder Removal
- Upright Level Cylinder Installation
- Tower Boom Lift Cylinder Removal
- Tower Lift Cylinder Installation
- Tower Telescope Cylinder Removal
- Tower Telescope Cylinder Installation
- 5.5 Hydraulic Cylinder repair
- Tower Boom Lift Cylinder
- Cleaning and Inspection
- Assembly
- Upright Level Cylinder
- Cleaning and Inspection
- Assembly
- Master Cylinder
- Cleaning and Inspection
- Assembly
- Main Boom Lift Cylinder
- Cleaning and Inspection
- Assembly
- Main Boom Telescope Cylinder
- Cleaning and Inspection
- Assembly
- Tower Boom Telescope Cylinder
- Cleaning and Inspection
- Assembly
- Platform Level (Slave) Cylinder
- Cleaning and Inspection
- Assembly
- Jib Lift Cylinder (AJ Only)
- Cleaning and Inspection
- Assembly
- Steer Cylinder
- Cleaning and Inspection
- Assembly
- Axle Lockout Cylinder
- 5.6 Hydraulic Pump (Gear)
- 5.7 Variable Pump
- 5.8 Hydraulic Component Start-Up
- 5.9 Pressure Setting Procedures
- Section 6. JLG Control System
- Section 7. Basic Electrical Information & Schematics

SECTION 4 - BOOM & PLATFORM
3121616 – JLG Lift – 4-7
4.3 BOOM CLEANLINESS GUIDELINES
Following are guidelines for machines used in excessively dirty
environments.
1. JLG recommends use of JLG Hostile Environment Pack-
age to keep internal portions of a boom cleaner and pre-
vent dirt and debris from entering the boom. This
package reduces the amount of contamination which
can enter the boom but does not eliminate the need for
more frequent inspections and maintenance when used
in these types of environments.
2. JLG recommends you follow all guidelines for servicing
your equipment in accordance with instructions out-
lined in the JLG Service & Maintenance Manual for your
machine. Periodic maintenance and inspection is vital to
the proper operation of the machine. Frequency of ser-
vice and maintenance must be increased as environ-
ment, severity, and frequency of usage requires.
3. Debris and foreign matter inside boom can cause pre-
mature failure of components and should be removed.
Methods to remove debris should always be done using
all applicable safety precautions outlined in the JLG
Operation & Safety Manual and the JLG Service & Main-
tenance Manuals.
4. The first attempt to remove debris from inside the boom
must be to utilize pressurized air to blow the debris
toward the nearest exiting point from the boom. Make
sure that all debris is removed before operating the
machine.
5. If pressurized air cannot dislodge debris, apply water
and mild solvents with a pressure washer. Wash debris
toward nearest exit point from the boom. Make sure all
debris is removed, no “puddling” of water has occurred,
and boom internal components are dry before operat-
ing machine. Comply with all federal and local laws for
disposing of wash water and debris.
6. If pressurized air or washing dislodges and removes
debris, disassemble boom in accordance with instruc-
tions outlined in the JLG Service & Maintenance Manual
to remove the debris.