Service Manual Instruction Manual
Table Of Contents
- Section A. Introduction - Maintenance Safety Precautions
- Section 1. Specifications
- Section 2. General
- Section 3. Chassis & Turntable
- 3.1 Tires And Wheels
- 3.2 Torque Hub
- Oil Information
- Roll and Leak Testing
- Tightening and Torquing Bolts
- Main Disassembly
- Output Carrier Disassembly
- Input Carrier Disassembly
- Hub-Spindle Disassembly
- Spindle-Brake Disassembly
- Cover Disassembly
- Cover Assembly
- Input Carrier Sub-Assembly
- Output Planet Gear Sub-Assembly
- Spindle - Brake Sub-Assembly
- Hub-Spindle Sub-Assembly
- Cover Sub-Assembly
- Main Assembly
- Integral Brake Check
- 3.3 Free Wheeling Option
- 3.4 Drive Motor
- 3.5 Oscillating Axle Bleeding Procedure and Lockout Test
- 3.6 Steer Adjustments
- 3.7 Swing Drive
- 3.8 Swing Bearing
- 3.9 Swing Brake - Mico
- 3.10 Rotary Coupling
- 3.11 Generator
- 3.12 Deutz D2.9 L4 Engine
- 3.13 Deutz D2011 Engine
- 3.14 Spark Arrester Cleaning Instructions
- 3.15 Glow Plugs
- 3.16 Deutz EMR 2
- 3.17 Bio Fuel in Deutz Engines
- 3.18 GM Engine General Maintenance
- 3.19 GM Engine Dual Fuel System
- Fuel Filter
- Direct Electronic Pressure Regulator (DEPR)
- Air Fuel Mixer
- Electronic Throttle Control (ETC)
- Electric Lock Off
- Engine Control Module (ECM)
- Heated Exhaust Gas Oxygen Sensor
- Gasoline Multi Point Fuel Injection System (MPFI)
- Gasoline Fuel Pump
- Gasoline Pressure And Temperature Sensor Manifold
- Fuel Filter
- Fuel Injector Rail
- Fuel Injector
- 3.20 GM Engine Fuel System Repair
- Propane Fuel System Pressure Relief
- Propane Fuel System Leak Test
- Propane Fuel Filter Replacement
- Direct Electronic Pressure Regulator (DEPR) Maintenance And Inspection
- Check/Drain Oil Build-Up In 2-Stage Vaporizer
- Air Fuel Mixer/Throttle Control Device Maintenance And Inspection
- Exhaust System And Catalytic Converter Inspection And Maintenance
- Temperature Manifold Absolute Pressure (TMAP) Sensor
- Throttle Body (ETC) Replacement
- Mixer Replacement
- Electronic Pressure Regulator (EPR) Replacement
- Regulator Replacement
- Coolant Hose Replacement
- Vapor Hose Replacement
- Engine Control Module Replacement
- Heated Exhaust Gas Oxygen Sensor Replacement
- 3.21 GM Engine LPG Fuel System Diagnosis
- Section 4. Boom & Platform
- Section 5. Hydraulics
- 5.1 O-Ring Lubrication
- 5.2 Cylinders - Theory of Operation
- 5.3 Cylinder Checking Procedure
- 5.4 Cylinder Removal and Installation
- Cylinder Locations
- Main Boom Telescope Cylinder Removal
- Main Boom Telescope Cylinder Installation
- Main Boom Lift Cylinder Removal
- Main Boom Lift Cylinder Installation
- Upright Level Cylinder Removal
- Upright Level Cylinder Installation
- Tower Boom Lift Cylinder Removal
- Tower Lift Cylinder Installation
- Tower Telescope Cylinder Removal
- Tower Telescope Cylinder Installation
- 5.5 Hydraulic Cylinder repair
- Tower Boom Lift Cylinder
- Cleaning and Inspection
- Assembly
- Upright Level Cylinder
- Cleaning and Inspection
- Assembly
- Master Cylinder
- Cleaning and Inspection
- Assembly
- Main Boom Lift Cylinder
- Cleaning and Inspection
- Assembly
- Main Boom Telescope Cylinder
- Cleaning and Inspection
- Assembly
- Tower Boom Telescope Cylinder
- Cleaning and Inspection
- Assembly
- Platform Level (Slave) Cylinder
- Cleaning and Inspection
- Assembly
- Jib Lift Cylinder (AJ Only)
- Cleaning and Inspection
- Assembly
- Steer Cylinder
- Cleaning and Inspection
- Assembly
- Axle Lockout Cylinder
- 5.6 Hydraulic Pump (Gear)
- 5.7 Variable Pump
- 5.8 Hydraulic Component Start-Up
- 5.9 Pressure Setting Procedures
- Section 6. JLG Control System
- Section 7. Basic Electrical Information & Schematics

SECTION 5 - HYDRAULICS
5-8 – JLG Lift – 3121616
Upright Level Cylinder Removal
1. With aid of an assistant, manually override Plunger Valve
with a pry bar. From Ground Control, use auxiliary power
and extend tower telescope to access leveling cylinder
rod end pin (3).
Figure 5-5. Plunger Valve Override
2. Position and support main boom as shown in Figure 5-
6., Boom Positioning and Support, Cylinder Repair.
3. Remove bolt and retaining pin from leveling cylinder to
upright pin (1).
4. Support upper boom assembly with overhead crane.
Raise boom until tension is released from cylinder pin
(1).
Figure 5-6. Boom Positioning and Support, Cylinder Repair
5. Drive barrel end attach pin (1) through mounting holes
in upright and leveling cylinder using a suitable drift.
6. Remove mounting hardware from upright to tower
boom assembly pivot pin (2).
7. Drive pivot pin (2) through mounting holes in upright
and tower boom assembly using a suitable drift.
8. Using all applicable safety precautions, operate over-
head crane to move upright and upper boom assembly
forward to clear tower boom.
9. After moving assemblies forward, operate overhead
crane left far enough to remove leveling cylinder.
10. Tag, disconnect, and cap level cylinder hydraulic lines.
11. Remove mounting hardware from leveling cylinder to
tower boom fly assembly rod end pin (3).
12. Drive leveling cylinder pin (3) through mounting holes
in tower boom fly and leveling cylinder using a suitable
drift. Remove leveling cylinder.
Upright Level Cylinder Installation
1. Place leveling cylinder in position in tower boom. Align
holes in tower boom and leveling cylinder. Install level-
ing cylinder attach pin (3) using a suitable rubber mallet.
2. Secure pin to tower boom with mounting hardware.
3. Remove cylinder port plugs and hydraulic line caps and
correctly attach lines to cylinder ports.
4. Using all applicable safety precautions, operate the
overhead crane to move upright and upper boom
assembly in proper position with tower boom.
5. Align holes in upright and tower boom assembly and
install upright pivot pin (2) using a suitable rubber mal-
let. Secure pin with mounting hardware.
6. Align holes in upright and leveling cylinder barrel end.
Install leveling cylinder pin (1) using a suitable rubber
mallet. Install keeper pin and bolt.
7. Remove overhead crane from upper boom. Activate
hydraulic system.
8. Using all applicable safety precautions, operate the
boom functions. Check for correct operation and
hydraulic leaks. Secure as necessary.
9. Check fluid level of hydraulic tank Adjust as needed.
Turntable Ref.
Lift Cylinder Ref.
Pry Bar
Plunger Valve
Boom Support
Chain
Attach
Point
Tower Lift
Cylinder
Upright
Slave Cylinder
Overhead Crane