Service Manual Instruction Manual
Table Of Contents
- Section A. Introduction - Maintenance Safety Precautions
- Section 1. Specifications
- Section 2. General
- Section 3. Chassis & Turntable
- 3.1 Tires And Wheels
- 3.2 Torque Hub
- Oil Information
- Roll and Leak Testing
- Tightening and Torquing Bolts
- Main Disassembly
- Output Carrier Disassembly
- Input Carrier Disassembly
- Hub-Spindle Disassembly
- Spindle-Brake Disassembly
- Cover Disassembly
- Cover Assembly
- Input Carrier Sub-Assembly
- Output Planet Gear Sub-Assembly
- Spindle - Brake Sub-Assembly
- Hub-Spindle Sub-Assembly
- Cover Sub-Assembly
- Main Assembly
- Integral Brake Check
- 3.3 Free Wheeling Option
- 3.4 Drive Motor
- 3.5 Oscillating Axle Bleeding Procedure and Lockout Test
- 3.6 Steer Adjustments
- 3.7 Swing Drive
- 3.8 Swing Bearing
- 3.9 Swing Brake - Mico
- 3.10 Rotary Coupling
- 3.11 Generator
- 3.12 Deutz D2.9 L4 Engine
- 3.13 Deutz D2011 Engine
- 3.14 Spark Arrester Cleaning Instructions
- 3.15 Glow Plugs
- 3.16 Deutz EMR 2
- 3.17 Bio Fuel in Deutz Engines
- 3.18 GM Engine General Maintenance
- 3.19 GM Engine Dual Fuel System
- Fuel Filter
- Direct Electronic Pressure Regulator (DEPR)
- Air Fuel Mixer
- Electronic Throttle Control (ETC)
- Electric Lock Off
- Engine Control Module (ECM)
- Heated Exhaust Gas Oxygen Sensor
- Gasoline Multi Point Fuel Injection System (MPFI)
- Gasoline Fuel Pump
- Gasoline Pressure And Temperature Sensor Manifold
- Fuel Filter
- Fuel Injector Rail
- Fuel Injector
- 3.20 GM Engine Fuel System Repair
- Propane Fuel System Pressure Relief
- Propane Fuel System Leak Test
- Propane Fuel Filter Replacement
- Direct Electronic Pressure Regulator (DEPR) Maintenance And Inspection
- Check/Drain Oil Build-Up In 2-Stage Vaporizer
- Air Fuel Mixer/Throttle Control Device Maintenance And Inspection
- Exhaust System And Catalytic Converter Inspection And Maintenance
- Temperature Manifold Absolute Pressure (TMAP) Sensor
- Throttle Body (ETC) Replacement
- Mixer Replacement
- Electronic Pressure Regulator (EPR) Replacement
- Regulator Replacement
- Coolant Hose Replacement
- Vapor Hose Replacement
- Engine Control Module Replacement
- Heated Exhaust Gas Oxygen Sensor Replacement
- 3.21 GM Engine LPG Fuel System Diagnosis
- Section 4. Boom & Platform
- Section 5. Hydraulics
- 5.1 O-Ring Lubrication
- 5.2 Cylinders - Theory of Operation
- 5.3 Cylinder Checking Procedure
- 5.4 Cylinder Removal and Installation
- Cylinder Locations
- Main Boom Telescope Cylinder Removal
- Main Boom Telescope Cylinder Installation
- Main Boom Lift Cylinder Removal
- Main Boom Lift Cylinder Installation
- Upright Level Cylinder Removal
- Upright Level Cylinder Installation
- Tower Boom Lift Cylinder Removal
- Tower Lift Cylinder Installation
- Tower Telescope Cylinder Removal
- Tower Telescope Cylinder Installation
- 5.5 Hydraulic Cylinder repair
- Tower Boom Lift Cylinder
- Cleaning and Inspection
- Assembly
- Upright Level Cylinder
- Cleaning and Inspection
- Assembly
- Master Cylinder
- Cleaning and Inspection
- Assembly
- Main Boom Lift Cylinder
- Cleaning and Inspection
- Assembly
- Main Boom Telescope Cylinder
- Cleaning and Inspection
- Assembly
- Tower Boom Telescope Cylinder
- Cleaning and Inspection
- Assembly
- Platform Level (Slave) Cylinder
- Cleaning and Inspection
- Assembly
- Jib Lift Cylinder (AJ Only)
- Cleaning and Inspection
- Assembly
- Steer Cylinder
- Cleaning and Inspection
- Assembly
- Axle Lockout Cylinder
- 5.6 Hydraulic Pump (Gear)
- 5.7 Variable Pump
- 5.8 Hydraulic Component Start-Up
- 5.9 Pressure Setting Procedures
- Section 6. JLG Control System
- Section 7. Basic Electrical Information & Schematics

SECTION 5 - HYDRAULICS
5-70 – JLG Lift – 3121616
5.8 HYDRAULIC COMPONENT START-UP
The goal at hydrostatic system start up is to preserve the
designed life span of the system. Use the following start-up
procedure when a new pump or motor is installed or a system
is restarted after a pump or motor has been removed and rein-
stalled.
THE FOLLOWING PROCEDURE MAY REQUIRE MACHINE TO BE DISABLED
(WHEELS RAISED OFF THE GROUND, WORK FUNCTIONS DISCONNECTED, ETC.)
WHILE PERFORMING PROCEDURE. TO PREVENT INJURY. TAKE NECESSARY
SAFETY PRECAUTIONS BEFORE MOVING VEHICLE/MACHINE.
Inspect pumps or motors for damage that may have been
incurred during shipping and handling before installation.
Make sure all system components (reservoir, hoses, valves, fit-
tings, heat exchanger, etc.) are clean before filling with fluid.
Fill reservoir with recommended hydraulic fluid. This fluid
should be passed through a 10 micron (nominal, no bypass)
filter before entering reservoir. Using contaminated fluid can
damage components and may cause unexpected vehicle/
machine movement.
INSPECT ALL PUMPS OR MOTORS FOR DAMAGE AND CONTAMINATION IF ANY
PUMP OR MOTOR IS REPLACED DUE TO INTERNAL DAMAGE. FLUSH AND
REPLACE ALL HYDRAULIC SYSTEM FLUID OR DAMAGE TO ENTIRE SYSTEM MAY
RESULT.
Inlet line from reservoir to pump must be filled prior to start-
up. Check inlet line for properly tightened fittings, restrictions,
and air leaks.
NOTE: Reservoir is usually above pump inlet. Pressure head cre-
ated by higher oil level helps keep inlet pressures within
acceptable range and prevent high vacuum levels. How-
ever, air may be trapped due to hose routing or low reser-
voir locations. Bleed air by loosening hose at fitting closest
to pump. When oil begins to flow, line is full and air has
been purged. Tighten fitting to specified torque. If tank
needs to be pressurized to start oil flow, take a vacuum
reading at pump inlet during operation to verify pump is
not trying to draw an inlet vacuum higher than its capabil-
ity.
Fill pump and motor housing with clean hydraulic fluid before
start up. Fill housing by pouring filtered oil in upper case drain
port.
NOTE: Use highest possible case drain port. This ensures housing con-
tains as much oil as possible and offers the greatest amount of
lubrication to internal components.
NOTE: It may be easier to fill housing before installing the case drain
line. Component (especially motor) location may prevent case
drain port access after installation.
NOTE: Oil used to fill component housing must be clean. Store fill
container properly to prevent contamination.
Install 1000 psi (60 bar) pressure gauge in charge pressure
gauge port to monitor charge pressure during start-up.
It is recommended external control input signal, (electrical
connections for EDC), be disconnected at pump control until
after initial start-up. This ensures pump remains in its neutral
position.
DO NOT START ENGINE UNLESS PUMP IS IN NEUTRAL POSITION (0° SWASH-
PLATE ANGLE). TAKE PRECAUTIONS TO PREVENT MACHINE MOVEMENT IN
CASE PUMP IS ACTUATED DURING INITIAL START-UP.
”Jog” or slowly rotate engine until charge pressure starts to
rise. Start engine and run at lowest possible RPM until charge
pressure is established. Excess air should be bled from system
lines as close to motors as possible.
NOTE: With engine on low idle loosen, do not remove, system lines
at motor(s). Continue to run engine at low idle and tighten
system lines as soon as oil is observed to leak from them.
When oil is observed to ”leak” at motor, line is full and air is
purged. Tighten system hoses to specified torque.
Once charge pressure is established, increase speed to normal
operating RPM. Charge pressure should be as indicated in the
pump model code. If charge pressure is inadequate, shut
down and determine cause.
INADEQUATE CHARGE PRESSURE WILL AFFECT OPERATOR'S ABILITY TO CON-
TROL MACHINE.
Shut down engine and connect external control input signal.
Reconnect machine function(s), if disconnected earlier. Start
engine, checking pump remains in neutral. With engine at nor-
mal operating RPM, slowly check forward and reverse machine
operation.
Charge pressure may slightly decrease during forward or
reverse operation. Continue to cycle slowly between forward
and reverse for at least five minutes.
Shut down engine, remove gauges, and plug ports. Check res-
ervoir level and add filtered fluid if needed.
Machine is ready for operation.