Operator Manual Instruction Manual
SECTION 4 - MACHINE OPERATION
3121297 – JLG Lift – 4-5
6. From Platform, pull Power/Emergency Stop
switch out.
7. Push the Engine Start switch until engine
starts.
NOTE: Footswitch must be in released (up) position before
starter will operate. If starter operates with footswitch in
the depressed position, DO NOT OPERATE MACHINE.
Shutdown Procedure
IF AN ENGINE MALFUNCTION CAUSES AN UNSCHEDULED SHUTDOWN,
DETERMINE THE CAUSE AND CORRECT IT BEFORE RESTARTING THE
ENGINE.
1. Remove all load and allow engine to operate at low
speed for 3-5 minutes; this allows further reduction of
internal engine temperature.
2. Push Power/Emergency Stop switch in.
3. Turn Platform/Ground Select switch to Off.
Refer to Engine Manufacturer’s manual for
detailed information.