User Manual

8-15
L2906H, 2906H, 3507H, 619A, 723A, 29.6LP, 29.6, 35.7
Hydraulic System
e. Main Control Valve Assembly
Note: ALWAYS replace seals, o-rings, gaskets, etc.,
with new parts to help ensure proper sealing and
operation. Lubricate seals and o-rings with clean
hydraul ic oil.
Assemble each Valve Section
1. Reassemble any plugs, check valves, compensator
valves, anti-cavitation valves, shock valves or
hydraulic remote positioners from individual valve
sections if equipped.
2. Install the end covers onto Lift/Lower and Crowd
sections.
Assemble the Main Control Valve
1. Place all thr ee t ie r ods with t he washe r s and nut s
throug h the e nd mai n co nt rol valve sec tio n.
2. Stand the end main control valve section on end.
3. Install proper o-rings on the inner face of the end
main control valve section. Align the Crowd section
over the three tie rods and slide onto the end main
control valve section.
4. Using proper o-rings and load sense shuttle, repeat
step three for the remaining sections.
5. Install the washers and nuts on the tie rods and
torque to 25 Nm (18.5 lb-ft).
f. Main Control Valve Installation
1. Loosely install the four main control valve mounting
bolts through bracket on the rear of the machine.
2. Install the main control valve onto the bracket,
aligning the bolts with the holes in the end sections
of the main control valve. Slide the main control
valve into position, and tighten the bolts.
3. Prime the main control valve by filling the inlet
openings with fresh, filtered hydraulic oil fro m a
clean container, before attaching the hoses.
4. Use new oiled o-rings as required. Uncap and
reattach and secure all hoses, clamps, etc. to the
main control valve.
5. Check the routing of all hoses, wiring and tubing for
sharp bends or interference with any rotating
members, and install tie wraps and/or protective
conduit as required. Tighten all tube and hose
clamps.
6. Start the engine and run at approximately one-third
to one-half throttle for about one minute without
moving the ma chine or oper ating any hydr aulic
functions.
7. Inspect for leaks and check the level of the hydraulic
oil in the reservoir. Shut the engine OFF.
8. Wipe up any hydraulic oil spillage in, on, near and
around the machine, work area and tool s.
9. Install the rear panel.
10. Remove the Do Not Operate Tags from both the
ignition key switch and the steering wheel.
g. Main Control Valve Test
Conduct a pressure check of the hydraulic system in its
entirety. Adjust pressure(s) as required. Refer to Section
8.6.2, “Main Control Valve Pressure Chec king.”
8.11.2 Service Brake Valve
The service brake valve is at the base of the steering
column support, concealed by the lower dash cover.
The service brakes themselves are part of the front axle.
Refer to Se ction 5, “ Axles, Drive Sha fts, Wheels a nd Tires,”
for fu rther infor mation.
a. Service Brake Valve Removal
1. Park the machine on a firm, level surface, fully
retract the boom, lower the boom, place the
transmission control lever in (N) NEUTRAL, engage
the park brake and shut the engine OFF.
2. Place a Do Not Operate Tag on both the ignition key
switch and the steering wheel, stating that the
machine should not be operated.
3. Open the engine cover. Allow the system fluids to
cool.
4. Remove the necessary dash panels.
5. Label, disconnect and cap the hydraulic hoses
connected to the service brake valve. Cap all fittings
and openings to keep dirt and debris from entering
the brake system .