Service Manual Owner's manual

Table Of Contents
SECTION 3 - CHASSIS & TURNTABLE
3-72 – JLG Lift – 3121139
10. A soft metal punch should be used to insure that this
retaining ring (1I) is completely seated in the groove
of the output shaft (1A).
EYE PROTECTION SHOULD BE WORN DURING THIS PROCEDURE.
11. Upon completion of step 10, rap the internal end of
the output shaft (1A) twice with a piece of soft metal
rod. This will release the preload which was on the
bearings.
This completes the hub shaft sub-assembly —items (1A)
through (1J). If this assembly is not going to be used right
away, it should be oiled and covered to help prevent rust-
ing,
Carrier Sub-Assembly
1. Apply a coat of grease or petroleum jelly to cluster
gear bore.
2. Place sixteen needle rollers into cluster gear bore.
3. Place spacer washer into opposite side of cluster
gear and against needle rollers.