Service Manual Owner's manual
Table Of Contents
- Section 1. Specifications
- Section 2. General
- Section 3. Chassis & Turntable
- 3.1 Tires & Wheels
- 3.2 Wheel Drive Assembly, 2WD
- 3.3 Drive Motor - 2WD (Prior to S/N 83331)
- 3.4 Drive Motor (S/N 83331 to Present)
- 3.5 Torque Hub
- 3.6 Wheel Drive Assembly, 4WD
- 3.7 Torque Hub (4WD Machines W/ Integral Brake)
- Roll, Leak and Brake Testing
- Tightening and Torquing Bolts
- Main Disassembly
- Input Carrier Disassembly
- Output Carrier Disassembly
- Housing-Spindle Disassembly
- Spindle-Brake Disassembly
- Input Carrier Sub-Assembly
- Output Carrier Sub-Assembly
- Spindle-Brake Sub-Assembly
- Housing-Spindle Sub-Assembly
- DW2B Integral Brake Check
- Main Assembly
- 3.8 Drive Brake, 2WD - Mico (Prior to S/N 83331)
- 3.9 Re-Aligning torque hub input coupling
- 3.10 Oscillating Axle Bleeding Procedure and Lockout Test
- 3.11 Swing Drive Hub
- 3.12 Swing Brake - Mico (Prior to S/N 66417)
- 3.13 Swing Motor (Prior to S/N 66417)
- 3.14 Swing Motor (S/N 66417 to Present)
- 3.15 Procedure For Setting Gear Backlash
- 3.16 Swing Bearing
- 3.17 Rotary Coupling
- 3.18 Generator
- 3.19 Ford EFI Engine
- 3.20 Deutz EMR 2 (S/N 85332 to Present)
- 3.21 GM Engine General Maintenance
- 3.22 GM Engine Dual Fuel System
- Fuel Filter
- Electric Lock Off
- EPR Assembly
- Low Pressure Regulator (LPR)
- Air Fuel Mixer
- Electronic Throttle Control (ETC)
- Engine Control Module
- Heated Exhaust Gas Oxygen Sensor
- Gasoline Multi Point Fuel Injection System (MPFI)
- Gasoline Fuel Pump
- Gasoline Pressure And Temperature Sensor Manifold
- Fuel Filter
- Fuel Injector Rail
- Fuel Injector
- 3.23 GM Engine Fuel System Repair
- Propane Fuel System Pressure Relief
- Propane Fuel System Leak Test
- Propane Fuel Filter Replacement
- Electronic Pressure Regulator (EPR) Assembly Replacement
- Temperature Manifold Absolute Pressure (TMAP) Sensor
- Electronic Throttle Control Replacement
- Mixer Replacement
- Coolant Hose Replacement
- Vapor Hose Replacement
- Engine Control Module Replacement
- Heated Exhaust Gas Oxygen Sensor Replacement
- 3.24 GM Engine LPG Fuel System Diagnosis
- Section 4. Boom & Platform
- Section 5. Hydraulics
- Section 6. JLG Control System
- Section 7. Basic Electrical information & schematics
SECTION 3 - CHASSIS & TURNTABLE
3-98 – JLG Lift – 3121139
NOTE: If the end cover has a valve (24) or has five bolt
holes, use the line you previously scribed on the
cover to radially align the end cover into its original
position.
21. Assemble the 5 or 7 special bolts (1) and screw in
finger tight. Remove and replace the two alignment
studs with bolts after the other bolts are in place.
Alternately and progressively tighten the bolts to pull
the end cover and other components into place with
a final torque of 22-26 ft. lbs. 45-55 ft. lbs.(61-75 N
m) for the seven 3/8-24 threaded bolts.
NOTE: The special bolts required for use with the relief or
shuttle valve (24) end cover assembly (2) are longer
than the bolts required with standard and cover
assembly. Refer to the individual service parts lists
or parts list charts for correct service part number if
replacement is required.