Service Manual Owner's manual
Table Of Contents
- Section 1. Specifications
- Section 2. General
- Section 3. Chassis & Turntable
- 3.1 Tires & Wheels
- 3.2 Wheel Drive Assembly, 2WD
- 3.3 Drive Motor - 2WD (Prior to S/N 83331)
- 3.4 Drive Motor (S/N 83331 to Present)
- 3.5 Torque Hub
- 3.6 Wheel Drive Assembly, 4WD
- 3.7 Torque Hub (4WD Machines W/ Integral Brake)
- Roll, Leak and Brake Testing
- Tightening and Torquing Bolts
- Main Disassembly
- Input Carrier Disassembly
- Output Carrier Disassembly
- Housing-Spindle Disassembly
- Spindle-Brake Disassembly
- Input Carrier Sub-Assembly
- Output Carrier Sub-Assembly
- Spindle-Brake Sub-Assembly
- Housing-Spindle Sub-Assembly
- DW2B Integral Brake Check
- Main Assembly
- 3.8 Drive Brake, 2WD - Mico (Prior to S/N 83331)
- 3.9 Re-Aligning torque hub input coupling
- 3.10 Oscillating Axle Bleeding Procedure and Lockout Test
- 3.11 Swing Drive Hub
- 3.12 Swing Brake - Mico (Prior to S/N 66417)
- 3.13 Swing Motor (Prior to S/N 66417)
- 3.14 Swing Motor (S/N 66417 to Present)
- 3.15 Procedure For Setting Gear Backlash
- 3.16 Swing Bearing
- 3.17 Rotary Coupling
- 3.18 Generator
- 3.19 Ford EFI Engine
- 3.20 Deutz EMR 2 (S/N 85332 to Present)
- 3.21 GM Engine General Maintenance
- 3.22 GM Engine Dual Fuel System
- Fuel Filter
- Electric Lock Off
- EPR Assembly
- Low Pressure Regulator (LPR)
- Air Fuel Mixer
- Electronic Throttle Control (ETC)
- Engine Control Module
- Heated Exhaust Gas Oxygen Sensor
- Gasoline Multi Point Fuel Injection System (MPFI)
- Gasoline Fuel Pump
- Gasoline Pressure And Temperature Sensor Manifold
- Fuel Filter
- Fuel Injector Rail
- Fuel Injector
- 3.23 GM Engine Fuel System Repair
- Propane Fuel System Pressure Relief
- Propane Fuel System Leak Test
- Propane Fuel Filter Replacement
- Electronic Pressure Regulator (EPR) Assembly Replacement
- Temperature Manifold Absolute Pressure (TMAP) Sensor
- Electronic Throttle Control Replacement
- Mixer Replacement
- Coolant Hose Replacement
- Vapor Hose Replacement
- Engine Control Module Replacement
- Heated Exhaust Gas Oxygen Sensor Replacement
- 3.24 GM Engine LPG Fuel System Diagnosis
- Section 4. Boom & Platform
- Section 5. Hydraulics
- Section 6. JLG Control System
- Section 7. Basic Electrical information & schematics
SECTION 3 - CHASSIS & TURNTABLE
3121139 – JLG Lift – 3-29
Assembly
.
1. Using a suitable press, press new bearing cups (3,
5), with large inside diameters facing out, into hub
(7) counter bores.
2. Place bearing cone (4) into bearing cup (3) in small
end of hub.
3. Press new seal (2) into hub counter bore with flat
metal side facing in. Use a flat object to ensure that
seal is pressed evenly and is flush with hub face.
4. Lower hub onto spindle (1) with large open end up.
5. Place bearing cone (6) over end of spindle and into
bearing cup.
6. Place bearing shim (8) over end of spindle and
against bearing cone.