Service Manual Owner's manual
Table Of Contents
- Section 1. Specifications
- Section 2. General
- Section 3. Chassis & Turntable
- 3.1 Tires & Wheels
- 3.2 Wheel Drive Assembly, 2WD
- 3.3 Drive Motor - 2WD (Prior to S/N 83331)
- 3.4 Drive Motor (S/N 83331 to Present)
- 3.5 Torque Hub
- 3.6 Wheel Drive Assembly, 4WD
- 3.7 Torque Hub (4WD Machines W/ Integral Brake)
- Roll, Leak and Brake Testing
- Tightening and Torquing Bolts
- Main Disassembly
- Input Carrier Disassembly
- Output Carrier Disassembly
- Housing-Spindle Disassembly
- Spindle-Brake Disassembly
- Input Carrier Sub-Assembly
- Output Carrier Sub-Assembly
- Spindle-Brake Sub-Assembly
- Housing-Spindle Sub-Assembly
- DW2B Integral Brake Check
- Main Assembly
- 3.8 Drive Brake, 2WD - Mico (Prior to S/N 83331)
- 3.9 Re-Aligning torque hub input coupling
- 3.10 Oscillating Axle Bleeding Procedure and Lockout Test
- 3.11 Swing Drive Hub
- 3.12 Swing Brake - Mico (Prior to S/N 66417)
- 3.13 Swing Motor (Prior to S/N 66417)
- 3.14 Swing Motor (S/N 66417 to Present)
- 3.15 Procedure For Setting Gear Backlash
- 3.16 Swing Bearing
- 3.17 Rotary Coupling
- 3.18 Generator
- 3.19 Ford EFI Engine
- 3.20 Deutz EMR 2 (S/N 85332 to Present)
- 3.21 GM Engine General Maintenance
- 3.22 GM Engine Dual Fuel System
- Fuel Filter
- Electric Lock Off
- EPR Assembly
- Low Pressure Regulator (LPR)
- Air Fuel Mixer
- Electronic Throttle Control (ETC)
- Engine Control Module
- Heated Exhaust Gas Oxygen Sensor
- Gasoline Multi Point Fuel Injection System (MPFI)
- Gasoline Fuel Pump
- Gasoline Pressure And Temperature Sensor Manifold
- Fuel Filter
- Fuel Injector Rail
- Fuel Injector
- 3.23 GM Engine Fuel System Repair
- Propane Fuel System Pressure Relief
- Propane Fuel System Leak Test
- Propane Fuel Filter Replacement
- Electronic Pressure Regulator (EPR) Assembly Replacement
- Temperature Manifold Absolute Pressure (TMAP) Sensor
- Electronic Throttle Control Replacement
- Mixer Replacement
- Coolant Hose Replacement
- Vapor Hose Replacement
- Engine Control Module Replacement
- Heated Exhaust Gas Oxygen Sensor Replacement
- 3.24 GM Engine LPG Fuel System Diagnosis
- Section 4. Boom & Platform
- Section 5. Hydraulics
- Section 6. JLG Control System
- Section 7. Basic Electrical information & schematics
SECTION 3 - CHASSIS & TURNTABLE
3121139 – JLG Lift – 3-31
14. Place o-ring (22) into hub counter bore. Use petro-
leum or grease to hold o-ring in place. Slight stretch-
ing of o-ring may be necessary to insure proper
seating.
15. Place carrier assembly on a flat surface with large
gears up and positioned as shown. Find punch
marked tooth on each large gear and locate at 12
o’clock (straight up) from each planet pin. Marked
tooth will be located just under carrier on upper two
gears.
16. With shoulder side of ring gear (21) facing down,
place ring gear over (into mesh with) large gears.
Ensure punch marks remain in correct location dur-
ing ring gear installation.
17. While holding ring gear, input gear, and cluster
gears in mesh, place small side of cluster gears into
mesh with internal gear. On ring gear, locate hole
marked ‘X’ over one of counter bored holes in hub.
NOTE: If gears do not mesh easily or carrier assembly does
not rotate freely, then remove carrier and ring gear
and check cluster gear timing.
18. Install input gear (37) into carrier, meshing with large
diameter cluster gears (18). Counter bore in bore of
input gear must be to outside of carrier assembly.
19. After inserting at least one shoulder bolt in the
proper location, rotate the carrier. Check freedom of
rotation and timing.
20. Install thrust washers and thrust bearing (39, 40) into
carrier counter bore.