Operator Manual User guide

Section 4 - Operation
4-10 31200744
Placing a Suspended Load
Before placing any load be sure that:
The landing point can safely support the weight of the load.
The landing point is level; front to back and side to side.
Use the capacity chart to determine safe boom extension range. “Use of the
Capacity Chart” on page 5-5
Align load at the level load is to be placed, then position boom slowly until load is
just above area where it is to be placed.
Ensure that the guide persons and operator remain in constant communication
(verbal or hand) when placing the load.
Disengaging a Suspended Load
Never place the guide persons between the suspended load and the telehandler.
Once at load destination, bring telehandler to a complete stop and apply park
brake prior to disengagement of lifting devices and tethers.