Operator Manual Owner manual

SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
6-8 – JLG Lift – 3128791
Figure 6-3. Component Maintenance Intervals - X550AJ - with Hatz Diesel Engine
HATZ DIESEL ENGINE
PART INTERVENTION
BEFORE
STARTING
AS
NEEDED
INTERVAL (HOURS)
10 50
100
250
500
1000
DRY AIR FILTER
CHECK, CLEAN
CHANGE
ENGINE OIL
CHECK LEVEL
CHANGE
*
ENGINE OIL FILTER
CLEAN
CHANGE
FUEL FILTER
CLEAN
CHANGE
WATER SEPARATOR
CLEAN AND DRAIN
WATER
*
COOLING
SYSTEM FINS
HYDRAULIC OIL
CHECK LEVEL
CHANGE
HYDRAULIC OIL
FILTER
CHANGE CARTRIDGE
*
ARTICULATED JOINT
POINTS
GREASE
*
BATTERY
CHECK ELECTROLYTE
LEVEL
REDUCTION GEAR
OIL
CHECK LEVEL
CHANGE
*
MACHINE
GENERAL PERIODICAL
CHECKS
*
EXTENSION ARM
INTERNAL SLIDING
RING
CHECK WEAR
CHANGE
TURNTABLE BOLT
TIGHTENING
CHECK
*
*
Firsttimeserviceinterval
thenperchartthereafter.
**
Every3monthsor
1000hrsofoperation.
***
Every5yearsor
2000hrsofoperation.
#
Checkeveryyear.
Ifthetorqueisnot
correctreplacethenuts
withtwonewnutsof
thesamespecification.
Installdrywithout
usingoilorgreaseto
specifiedtorque.
PLATFORM MOUNT
PIN NUTS
#
CHECK TORQUE
200 Nm
CLEAN