INSTALLATION INSTRUCTIONS EZtrak Z200 / ZTrak Z300 Boarding Step ST50617 06/06/2022 ENGLISH LP66653
Product Compatibility This kit is compatible with EZTrak Z200 (2015 and prior) and ZTrak Z300 (2016 and later) series mowers. Parts in Kit A B Parts Description Hardware Bag Qty Qty Platform (A) 1 3/8” x 2 1/2” Flange Bolt 4 Clamp Plate (B) 1 3/8” Flange Nut 4 NOTE: Retain these installation instructions with the machine operator’s manual.
Installing Parking Safely 1. Stop machine on a level surface 2. Disengage mower blades 3. Move motion control levers out to the Start/Shutdown position 4. Lock the park brake 5. Stop the engine 6. Remove the key 7. Wait for engine and all moving parts to stop before you leave the operator’s seat 8. Disconnect the negative battery cable or remove the spark plug wire (for gasoline engines) before servicing the machine Installing 1.
Warranty Limited Warranty for New John Deere Licensed Products Agri-Fab's Boarding Step is guaranteed to be free from defects in material and workmanship from the date of purchase for 2 years residential use, 6 months commercial use, provided that the purchaser properly assembles, installs, uses and maintains the products in accordance with this manual. Purchaser’s failure to adhere to such requirements will void the warranty.