User manual
6
Drilling the Ceiling/Support
Shelf
• Use a plumb line to mark the centre of the hob on the
ceiling/support shelf.
• Place the drilling template 21 provided on the ceiling/
support shelf, making sure that the template is in the
correct position by lining up the axes of the template
with those of the hob.
• Mark the centres of the holes in the template.
• Drill the holes at the points marked:
• For concrete ceilings, drill for plugs appropriate to the
screw size.
• For hollow brick ceilings with wall thickness of 20
mm: drill ø 10 mm (immediately insert the Dowels
not provided).
• For wooden beam ceilings, drill according to the wood
screws used.
• For wooden shelf, drill ø 7 mm.
• For the power supply cable feed, drill ø 10 mm.
• For the air outlet (Ducted Version), drill according to
the diameter of the external air exhaust duct connec-
tion.
• Insert two screws of the following type, crossing them
and leaving 4-5 mm from the ceiling:
• For concrete ceilings, use the appropriate plugs for the
screw size (not provided).
• For Cavity ceiling with inner space, with wall thickness
of approx. 20 mm, Screws not provided.
• For wooden beam ceilings, use 4 wood screws (not
provided).
• For wooden shelf, use 4 screws with washers and nuts
(not provided)
Fixing the Frame
• Loosen the two screws fastening the lower chimney and
remove this from the lower fra me.
• Loosen the two screws fastening the upper chimney
and remove this from the upper fra me.
If you wish to adjust the height of the frame, proceed as
follows:
• Unfasten the eight metric screws joining the two columns,
located at the sides of the frame.
• Adjust the frame to the height required, then replace
all the screws removed as above.
• Insert the upper chimney stack from above, and leave it
running free on the frame.
• Lift up the frame, fit the frame slots onto the screws
up to the slot end positions.
• Tighten the two screws and fasten the other two screws
provided with the hood.
Installing the Cooker Hood
2
2
1
1