Installation Guide

5
14. Repeat for opposite side.
15. Secure brackets to tower using #6 3/4in. screws.
STEP 5 - Installing Top Shelf & Tower
It is recommended to install hardware into wall studs. Typically 16 in. on
center. Use 50 lb. wall anchors provided if no stud is present.
On the top level line space shelf mounting L-clip hardware equidistant in
the following manner:
3 L-clip hardware within the 48in. shelf location
2 L-clip hardware within the tower top location
NOTE: AT LEAST 1 L-CLIP HARDWARE MUST BE IN-
STALLED INTO A WALL STUD AT TOWER TOP LOCATION
1. Center the top screw hole of the shelf mounting L-clip hardware with the
level line & mark all hole locations.
2. Secure L-clip to wall using #8 1 1/2 in. screws at hole locations (Use wall
anchors provided if no stud is present).
3. Repeat for remaining L-clip locations.
4. Position shelf end template onto side wall.
5. Align template line with adjacent wall line.
6. Level template.
7. Mark required Shelf End position for required depth (12in. or 16in. depth).
8. Secure Shelf End using #8 - 1 1/2in. screws (use wall anchor if no stud is
present).
9. Place shelf onto hardware.
10. Place tower onto hardware.
11. Place a shelf end onto the tower of the shelf at tower end.
12. Flush tower with top shelf by moving tower left or right.
13. Level shelf front to back & mark shelf end hardware location on tower.
11 12
13 15
1 2
2 3
4 5
6 7
8 8
9 10
11
12
13