SEDIMENT TRAPS
Asedimenttrapshouldbeinstalledasclosetotheinletofthewater
heater as practical at the time of water heater installation. The
sedimenttrapshouldbeeitherateettingwithacappednipple
in the bottom outlet or other device recognized as an effective
sediment trap. If a tee tting is used, it should be installed in
conformance with one of the methods of installation shown in
Figures12and13.
Contaminantsinthegaslinesmaycauseimproperoperationofthe
gascontrolvalvethatmayresultinreorexplosion.Beforeattaching
thegaslinebesurethatallgaspipeiscleanontheinside.Totrapany
dirtorforeignmaterialinthegassupplyline,adripleg(sometimes
calledasedimenttrap)mustbeincorporatedinthepiping.Thedrip
legmustbereadilyaccessible.Installinaccordancewiththe“Gas
Piping”section.RefertothecurrenteditionoftheNaturalGasand
PropaneInstallationCode(CAN/CSAB149.1).
FIGURE 14.
FILLING THE WATER HEATER
Neverusethiswaterheaterunlessitiscompletelyfullofwater.Toprevent
damagetothetank,thetankmustbelledwithwater.Watermustow
fromthehotwaterfaucetbeforeturning“ON”gastothewaterheater.
Tollthewaterheaterwithwater:
1. Closethewaterheaterdrainvalvebyturningthehandletotheright
(clockwise).Thedrainvalveisonthelowerfrontofthewaterheater.
2. Open the cold water supply valve to the water heater.
NOTE: The cold water supply valve must be left open when
the water heater is in use.
3. Toinsurecompletellingofthetank,allowairtoexitbyopeningthe
nearesthotwaterfaucet.Allowwatertorununtilaconstantowis
obtained.Thiswillletairoutofthewaterheaterandthepiping.
4. Checkallwaterpipingandconnectionsforleaks.Repairasneeded.
VENT PIPE ASSEMBLY
Therearethreepartsoftheventpipeassemblythatconnectthewater
heaterexhaust(locatedonthelowerbacksideofthewaterheater)to
theinletoftheblowerassembly(mountedontopofthewaterheater)as
showninFigure1.Thesepartswillneedtobeassembledaccordingto
theinstructionsintheVENTPIPEPREPARATIONsectionofthismanual.
ThesePVCpartsshouldbeassembledwithIPEXSystem636CPVC
CementProductCode196047.
AssembleVentPipeAssemblies#1,#2and#3(SeeFigure1)prior
tocementing.ThepreferredorientationofVentPipeAssembly#1
(Condensate U-Assembly) is shown in Figure 16. However this
assemblymayberotatedtoadifferentorientationasneededforthe
specicinstallationrequirements.Notetherotationalorientationof
eachpartbymarkingalineseveralincheslongacrossthejoints.The
longtubeofVentPipeAssembly#2shouldbeapproximatelyvertical.
IfitisfoundthateitherofthetwopiecesofpipeinVentPipeAssembly
#2aretoolongforpropert-up,thenremoveaslittlematerialas
possibletoimprovethet-up.Keepinmindthatthepipeswillinsert
slightlyfurtherintotheelbowswhencementisappliedasitactsas
a lubricatingagent. Thevertical distance fromthe bottom of the
CondensateU-Assemblytotheoorthatsupportsthewaterheater
shouldbeapproximately0.25”(0.64cm),seeFigure16.Disassemble
thepartsandcementbacktogetherusingthealignmentmarks.After
thecementdries,attachtheassemblytotheblowerandthewater
heaterexhaustusingthesuppliedrubberbootsandhoseclamps.
Acondensatetrapisincorporatedinthebottomofthisventpipe
assembly. See the CONDENSATE section of this manual for
furtherdetails.
VENTING